[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"$fcgg30xjrpysc":3,"plans-2018":37,"account":-1,"meta":992},[4,15,24,31],{"year":5,"title":6,"plans":7,"linked":8,"areas":9,"compared":14},2018,"Defensienota 2018 – investeren in onze mensen, slagkracht en zichtbaarheid",65,29,[10,11,12,13],"maritiem","land","lucht","defensiebreed",19,{"year":16,"title":17,"plans":18,"linked":19,"areas":20,"compared":23},2022,"Defensienota 2022 – Sterker Nederland, veiliger Europa",201,113,[13,10,11,12,21,22],"infrastructuur","it",5,{"year":25,"title":26,"plans":27,"linked":28,"areas":29,"compared":30},2024,"Defensienota 2024: Sterk, slim en samen",21,9,[11,10,12,13],0,{"year":32,"title":33,"plans":34,"linked":30,"areas":35,"compared":30},2026,"Defensienota 2026 – Samen voorwaarts!",12,[13,10,12,11,36,22],"marechaussee",{"id":38,"year":5,"title":6,"published":39,"source":40,"sha256":42,"table":43,"about":48,"plans":55,"updated":991,"overviewYear":32,"hasOverviewAfter":162},"defensienota-2018","2018-03-28",{"title":6,"url":41},"https:\u002F\u002Fzoek.officielebekendmakingen.nl\u002Fblg-836989.pdf","6e7e5b10980cd6ad1ce719803aed1326f4946b0e9d518f92f1f8f668c3904f1f",{"title":44,"pages":45,"years":46},"Bijlage IV Het investeringsprogramma","27–28",[5,47],2033,[49,52],{"text":50,"source":51},"In bijlage IV is het investeringsprogramma te vinden met alle vervangings- en vernieuwingsinvesteringen (boven de 25 miljoen euro) voor de komende vijftien jaar.",{"title":6,"url":41},{"text":53,"source":54},"Conform het Defensie Materieel Proces (DMP) zal de Tweede Kamer per project ter informatie brieven over de behoeftestelling (A-brief), de onderzoeksfase (B-brief) en eventueel vervolgonderzoek (C-brief) ontvangen. Verwervingsbesluiten (D-brief) worden ter behandeling aan de Tweede Kamer voorgelegd.",{"title":6,"url":41},[56,90,117,141,159,182,205,216,227,239,252,261,282,295,306,327,349,368,379,398,409,421,432,452,469,488,498,509,528,538,548,558,568,579,599,617,628,639,650,664,672,687,698,709,720,732,746,760,777,787,802,813,824,834,854,865,876,887,906,916,935,946,960,971,981],{"id":57,"name":58,"area":10,"budget":59,"briefs":60,"instroom":66,"projectId":68,"official":69,"project":72,"comparison":85},"vervanging-onderzeebootcapaciteit-ozbt","Vervanging Onderzeebootcapaciteit (OZBT)","> 2,5 miljard",[61,63],{"brief":62,"year":5},"B-brief",{"brief":64,"year":65},"D-brief",2021,[67],2027,"vervanging-onderzeebootcapaciteit",{"text":70,"source":71},"Bijlage IV Het investeringsprogramma … Maritiem … Vervanging Onderzeebootcapaciteit (OZBT) … > 2,5 miljard",{"title":6,"url":41},{"id":68,"name":73,"steps":74,"newest":84},"Vervanging onderzeebootcapaciteit",[75,79],{"year":5,"edition":76,"phase":77,"label":78},"MPO 2018","onderzoek","In onderzoek",{"year":80,"edition":81,"phase":82,"label":83},2020,"DPO 2020","realisatie","In realisatie",{"year":80,"edition":81,"phase":82,"label":83},{"planned":86,"realisation":87,"yearsLater":88,"verdict":89},{"brief":62,"year":5},{"year":80,"edition":81,"phase":82,"label":83},2,"later",{"id":91,"name":92,"area":10,"budget":59,"briefs":93,"instroom":100,"projectId":102,"official":103,"project":106,"comparison":113},"vervanging-luchtverdedigings-en-commando-fregatten-lcf-incl-studies","Vervanging Luchtverdedigings- en Commando Fregatten (LCF) (incl. studies)",[94,96,98],{"brief":95,"year":65},"A-brief",{"brief":62,"year":97},2023,{"brief":64,"year":99},2025,[101],2029,"vervanging-lc-fregatten",{"text":104,"source":105},"Bijlage IV Het investeringsprogramma … Maritiem … Vervanging Luchtverdedigings- en Commando Fregatten (LCF) (incl. studies) … > 2,5 miljard",{"title":6,"url":41},{"id":102,"name":107,"steps":108,"newest":111},"Vervanging LC-fregatten",[109],{"year":25,"edition":110,"phase":77,"label":78},"DPO 2024",{"year":32,"edition":112,"phase":77,"label":78},"DPO 2026",{"planned":114,"realisation":115,"yearsLater":115,"verdict":116},{"brief":62,"year":97},null,"nog-niet",{"id":118,"name":119,"area":10,"budget":120,"briefs":121,"instroom":126,"projectId":127,"official":128,"project":131,"comparison":137},"vervanging-multipurpose-fregat-mff","Vervanging Multipurpose Fregat (MFF)","1000-2500 miljoen",[122,123,125],{"brief":95,"year":5},{"brief":62,"year":124},2019,{"brief":64,"year":80},[25],"vervanging-m-fregatten-aswf",{"text":129,"source":130},"Bijlage IV Het investeringsprogramma … Maritiem … Vervanging Multipurpose Fregat (MFF) … 1000-2500 miljoen",{"title":6,"url":41},{"id":127,"name":132,"steps":133,"newest":136},"Vervanging M-fregatten (ASWF)",[134,135],{"year":5,"edition":76,"phase":77,"label":78},{"year":80,"edition":81,"phase":82,"label":83},{"year":32,"edition":112,"phase":82,"label":83},{"planned":138,"realisation":139,"yearsLater":140,"verdict":89},{"brief":62,"year":124},{"year":80,"edition":81,"phase":82,"label":83},1,{"id":142,"name":143,"area":10,"budget":144,"briefs":145,"instroom":148,"projectId":149,"official":150,"project":153,"comparison":115},"vervanging-maritime-counter-mines-mcm-capaciteit","Vervanging Maritime Counter Mines (MCM) Capaciteit","250-1000 miljoen",[146,147],{"brief":95,"year":5},{"brief":64,"year":124},[25],"vervanging-mijnenbestrijdingscapaciteit",{"text":151,"source":152},"Bijlage IV Het investeringsprogramma … Maritiem … Vervanging Maritime Counter Mines (MCM) Capaciteit … 250-1000 miljoen",{"title":6,"url":41},{"id":149,"name":154,"steps":155,"newest":157},"Vervanging mijnenbestrijdingscapaciteit",[156],{"year":5,"edition":76,"phase":82,"label":83},{"year":97,"edition":158,"phase":82,"label":83},"DPO 2023",{"id":160,"name":161,"area":10,"budget":144,"mandate":162,"briefs":163,"instroom":167,"projectId":168,"official":169,"project":172,"comparison":177},"verwerving-combat-support-ship-css","Verwerving Combat Support Ship (CSS)",true,[164,165],{"brief":95,"year":5},{"brief":166,"year":124},"B\u002FD-brief",[16],"verwerving-combat-support-ship",{"text":170,"source":171},"Bijlage IV Het investeringsprogramma … Maritiem … Verwerving Combat Support Ship (CSS) … 250-1000 miljoen",{"title":6,"url":41},{"id":168,"name":173,"steps":174,"newest":176},"Verwerving Combat Support Ship",[175],{"year":5,"edition":76,"phase":82,"label":83},{"year":32,"edition":112,"phase":82,"label":83},{"planned":178,"realisation":179,"yearsLater":180,"verdict":181},{"brief":166,"year":124},{"year":5,"edition":76,"phase":82,"label":83},-1,"op-tijd",{"id":183,"name":184,"area":10,"budget":144,"briefs":185,"instroom":189,"projectId":190,"official":191,"project":194,"comparison":201},"verwerving-en-integratie-evolved-sea-sparrow-missile-essm-block-2","Verwerving & Integratie Evolved Sea Sparrow Missile (ESSM) Block 2",[186,187,188],{"brief":95,"year":5},{"brief":62,"year":124},{"brief":64,"year":80},[16],"essm-block-2-verwerving-en-integratie",{"text":192,"source":193},"Bijlage IV Het investeringsprogramma … Maritiem … Verwerving & Integratie Evolved Sea Sparrow Missile (ESSM) Block 2 … 250-1000 miljoen",{"title":6,"url":41},{"id":190,"name":195,"steps":196,"newest":200},"ESSM Block 2: Verwerving en integratie",[197,198],{"year":5,"edition":76,"phase":77,"label":78},{"year":16,"edition":199,"phase":82,"label":83},"DPO 2022",{"year":32,"edition":112,"phase":82,"label":83},{"planned":202,"realisation":203,"yearsLater":204,"verdict":89},{"brief":62,"year":124},{"year":16,"edition":199,"phase":82,"label":83},3,{"id":206,"name":207,"area":10,"budget":144,"briefs":208,"instroom":212,"official":213,"project":115,"comparison":115},"vervanging-all-terrain-vehicle-atv","Vervanging All Terrain Vehicle (ATV)",[209,210,211],{"brief":95,"year":124},{"brief":62,"year":65},{"brief":64,"year":16},[25],{"text":214,"source":215},"Bijlage IV Het investeringsprogramma … Maritiem … Vervanging All Terrain Vehicle (ATV) … 250-1000 miljoen",{"title":6,"url":41},{"id":217,"name":218,"area":10,"budget":144,"briefs":219,"instroom":223,"official":224,"project":115,"comparison":115},"vervanging-standard-missile-2-block-iiia-sm2-iiia","Vervanging Standard Missile 2 Block IIIA (SM2-IIIA)",[220,221,222],{"brief":95,"year":97},{"brief":62,"year":99},{"brief":64,"year":32},[101],{"text":225,"source":226},"Bijlage IV Het investeringsprogramma … Maritiem … Vervanging Standard Missile 2 Block IIIA (SM2-IIIA) … 250-1000 miljoen",{"title":6,"url":41},{"id":228,"name":229,"area":10,"budget":144,"briefs":230,"instroom":234,"official":236,"project":115,"comparison":115},"vervanging-zr-ms-rotterdam-lpd-1","Vervanging Zr. Ms. Rotterdam (LPD-1)",[231,232,233],{"brief":95,"year":97},{"brief":62,"year":99},{"brief":64,"year":32},[235],2030,{"text":237,"source":238},"Bijlage IV Het investeringsprogramma … Maritiem … Vervanging Zr. Ms. Rotterdam (LPD-1) … 250-1000 miljoen",{"title":6,"url":41},{"id":240,"name":241,"area":10,"budget":144,"briefs":242,"instroom":247,"official":249,"project":115,"comparison":115},"vervanging-zr-ms-johan-de-witt-lpd-2","Vervanging Zr. Ms. Johan de Witt (LPD-2)",[243,244,245],{"brief":95,"year":99},{"brief":62,"year":67},{"brief":64,"year":246},2028,[248],2032,{"text":250,"source":251},"Bijlage IV Het investeringsprogramma … Maritiem … Vervanging Zr. Ms. Johan de Witt (LPD-2) … 250-1000 miljoen",{"title":6,"url":41},{"id":253,"name":254,"area":10,"budget":255,"briefs":256,"instroom":257,"official":258,"project":115,"comparison":115},"midlife-update-mlu-luchtverdedigings-en-commando-fregatten-lcf","Midlife Update (MLU) Luchtverdedigings- en Commando Fregatten (LCF)","100-250 miljoen",[],[5],{"text":259,"source":260},"Bijlage IV Het investeringsprogramma … Maritiem … Midlife Update (MLU) Luchtverdedigings- en Commando Fregatten (LCF) … 100-250 miljoen",{"title":6,"url":41},{"id":262,"name":263,"area":10,"budget":255,"mandate":162,"briefs":264,"instroom":267,"projectId":268,"official":269,"project":272,"comparison":279},"vervanging-kanons-luchtverdedigings-en-commando-fregatten-lcf","Vervanging Kanons Luchtverdedigings- en Commando Fregatten (LCF)",[265,266],{"brief":95,"year":5},{"brief":166,"year":124},[80],"vervanging-127-mm-kanon-luchtverdedigings-en-commandofregatten",{"text":270,"source":271},"Bijlage IV Het investeringsprogramma … Maritiem … Vervanging Kanons Luchtverdedigings- en Commando Fregatten (LCF) … 100-250 miljoen",{"title":6,"url":41},{"id":268,"name":273,"steps":274,"newest":278},"Vervanging 127 mm kanon Luchtverdedigings- en Commandofregatten",[275,276],{"year":5,"edition":76,"phase":77,"label":78},{"year":124,"edition":277,"phase":82,"label":83},"DPO 2019",{"year":32,"edition":112,"phase":82,"label":83},{"planned":280,"realisation":281,"yearsLater":30,"verdict":181},{"brief":166,"year":124},{"year":124,"edition":277,"phase":82,"label":83},{"id":283,"name":284,"area":10,"budget":255,"briefs":285,"instroom":286,"projectId":283,"official":287,"project":290,"comparison":115},"vervanging-mk46-lightweight-torpedo","Vervanging MK46 Lightweight Torpedo",[],[80],{"text":288,"source":289},"Bijlage IV Het investeringsprogramma … Maritiem … Vervanging MK46 Lightweight Torpedo … 100-250 miljoen",{"title":6,"url":41},{"id":283,"name":291,"steps":292,"newest":294},"Vervanging MK46 Lightweight torpedo",[293],{"year":5,"edition":76,"phase":82,"label":83},{"year":32,"edition":112,"phase":82,"label":83},{"id":296,"name":297,"area":10,"budget":255,"mandate":162,"briefs":298,"instroom":302,"official":303,"project":115,"comparison":115},"verwerving-torpedo-defensiesysteem-vlootbreed","Verwerving Torpedo Defensiesysteem (vlootbreed)",[299,300,301],{"brief":95,"year":5},{"brief":62,"year":124},{"brief":64,"year":80},[65],{"text":304,"source":305},"Bijlage IV Het investeringsprogramma … Maritiem … Verwerving Torpedo Defensiesysteem (vlootbreed) … 100-250 miljoen",{"title":6,"url":41},{"id":307,"name":308,"area":10,"budget":255,"mandate":162,"briefs":309,"instroom":313,"projectId":314,"official":315,"project":318,"comparison":324},"vervanging-harpoon-missile-surface-to-surface-missile","Vervanging Harpoon Missile (surface-to-surface missile)",[310,311,312],{"brief":95,"year":5},{"brief":62,"year":124},{"brief":64,"year":80},[97],"vervanging-maritiem-surface-to-surface-missile",{"text":316,"source":317},"Bijlage IV Het investeringsprogramma … Maritiem … Vervanging Harpoon Missile (surface-to-surface missile) … 100-250 miljoen",{"title":6,"url":41},{"id":314,"name":319,"steps":320,"newest":323},"Vervanging Maritiem Surface-to-surface missile",[321,322],{"year":5,"edition":76,"phase":77,"label":78},{"year":80,"edition":81,"phase":82,"label":83},{"year":32,"edition":112,"phase":82,"label":83},{"planned":325,"realisation":326,"yearsLater":140,"verdict":89},{"brief":62,"year":124},{"year":80,"edition":81,"phase":82,"label":83},{"id":328,"name":329,"area":10,"budget":255,"briefs":330,"instroom":334,"projectId":335,"official":336,"project":339,"comparison":346},"vervanging-goalkeeper-close-in-weapon-system","Vervanging Goalkeeper (Close-in Weapon System)",[331,332,333],{"brief":95,"year":5},{"brief":62,"year":124},{"brief":64,"year":80},[97],"vervanging-close-in-weapon-system-vciws",{"text":337,"source":338},"Bijlage IV Het investeringsprogramma … Maritiem … Vervanging Goalkeeper (Close-in Weapon System) … 100-250 miljoen",{"title":6,"url":41},{"id":335,"name":340,"steps":341,"newest":345},"Vervanging Close-in Weapon System (vCIWS)",[342,343],{"year":5,"edition":76,"phase":77,"label":78},{"year":65,"edition":344,"phase":82,"label":83},"DPO 2021",{"year":32,"edition":112,"phase":82,"label":83},{"planned":347,"realisation":348,"yearsLater":88,"verdict":89},{"brief":62,"year":124},{"year":65,"edition":344,"phase":82,"label":83},{"id":350,"name":351,"area":10,"budget":255,"briefs":352,"instroom":356,"projectId":350,"official":357,"project":360,"comparison":365},"vervanging-middelzwaar-landingsvaartuig-lcvp","Vervanging Middelzwaar Landingsvaartuig (LCVP)",[353,354,355],{"brief":95,"year":80},{"brief":62,"year":65},{"brief":64,"year":16},[25],{"text":358,"source":359},"Bijlage IV Het investeringsprogramma … Maritiem … Vervanging Middelzwaar Landingsvaartuig (LCVP) … 100-250 miljoen",{"title":6,"url":41},{"id":350,"name":361,"steps":362,"newest":364},"Vervanging middelzwaar landingsvaartuig (LCVP)",[363],{"year":97,"edition":158,"phase":82,"label":83},{"year":32,"edition":112,"phase":82,"label":83},{"planned":366,"realisation":367,"yearsLater":88,"verdict":89},{"brief":62,"year":65},{"year":97,"edition":158,"phase":82,"label":83},{"id":369,"name":370,"area":10,"budget":255,"briefs":371,"instroom":375,"official":376,"project":115,"comparison":115},"vervanging-zr-ms-mercuur-en-hydrografische-opname-vaartuigen-hovs","Vervanging Zr. Ms. Mercuur & Hydrografische Opname Vaartuigen (HOVs)",[372,373,374],{"brief":95,"year":80},{"brief":62,"year":65},{"brief":64,"year":16},[32,47],{"text":377,"source":378},"Bijlage IV Het investeringsprogramma … Maritiem … Vervanging Zr. Ms. Mercuur & Hydrografische Opname Vaartuigen (HOVs) … 100-250 miljoen",{"title":6,"url":41},{"id":380,"name":381,"area":10,"budget":255,"briefs":382,"instroom":386,"projectId":380,"official":387,"project":390,"comparison":395},"midlife-update-mlu-oceangoing-patrol-vessel-opv","Midlife Update (MLU) Oceangoing Patrol Vessel (OPV)",[383,384,385],{"brief":95,"year":65},{"brief":62,"year":16},{"brief":64,"year":97},[99],{"text":388,"source":389},"Bijlage IV Het investeringsprogramma … Maritiem … Midlife Update (MLU) Oceangoing Patrol Vessel (OPV) … 100-250 miljoen",{"title":6,"url":41},{"id":380,"name":381,"steps":391,"newest":394},[392,393],{"year":16,"edition":199,"phase":77,"label":78},{"year":97,"edition":158,"phase":82,"label":83},{"year":32,"edition":112,"phase":82,"label":83},{"planned":396,"realisation":397,"yearsLater":140,"verdict":89},{"brief":62,"year":16},{"year":97,"edition":158,"phase":82,"label":83},{"id":399,"name":400,"area":10,"budget":255,"briefs":401,"instroom":405,"official":406,"project":115,"comparison":115},"midlife-update-mlu-zr-ms-karel-doorman-joint-support-ship-jss","Midlife Update (MLU) Zr. Ms. Karel Doorman (Joint Support Ship, JSS)",[402,403,404],{"brief":95,"year":16},{"brief":62,"year":25},{"brief":64,"year":99},[246],{"text":407,"source":408},"Bijlage IV Het investeringsprogramma … Maritiem … Midlife Update (MLU) Zr. Ms. Karel Doorman (Joint Support Ship, JSS) … 100-250 miljoen",{"title":6,"url":41},{"id":410,"name":411,"area":10,"budget":255,"briefs":412,"instroom":416,"official":418,"project":115,"comparison":115},"vervanging-mk48-heavyweight-torpedo","Vervanging MK48 Heavyweight Torpedo",[413,414,415],{"brief":95,"year":25},{"brief":62,"year":32},{"brief":64,"year":246},[417],2031,{"text":419,"source":420},"Bijlage IV Het investeringsprogramma … Maritiem … Vervanging MK48 Heavyweight Torpedo … 100-250 miljoen",{"title":6,"url":41},{"id":422,"name":423,"area":10,"budget":255,"briefs":424,"instroom":428,"official":429,"project":115,"comparison":115},"vervanging-zwaar-landingsvaartuig-lcu","Vervanging Zwaar Landingsvaartuig (LCU)",[425,426,427],{"brief":95,"year":99},{"brief":62,"year":67},{"brief":64,"year":246},[417],{"text":430,"source":431},"Bijlage IV Het investeringsprogramma … Maritiem … Vervanging Zwaar Landingsvaartuig (LCU) … 100-250 miljoen",{"title":6,"url":41},{"id":433,"name":434,"area":10,"budget":435,"mandate":162,"briefs":436,"instroom":439,"projectId":440,"official":441,"project":444,"comparison":449},"midlife-update-mlu-hydrografische-opname-vaartuigen-hovs","Midlife Update (MLU) Hydrografische Opname Vaartuigen (HOVs)","25-100 miljoen",[437,438],{"brief":95,"year":5},{"brief":166,"year":124},[80],"midlife-update-hydrografische-opnemingsvaartuigen",{"text":442,"source":443},"Bijlage IV Het investeringsprogramma … Maritiem … Midlife Update (MLU) Hydrografische Opname Vaartuigen (HOVs) … 25-100 miljoen",{"title":6,"url":41},{"id":440,"name":445,"steps":446,"newest":448},"Midlife Update Hydrografische Opnemingsvaartuigen",[447],{"year":5,"edition":76,"phase":82,"label":83},{"year":65,"edition":344,"phase":82,"label":83},{"planned":450,"realisation":451,"yearsLater":180,"verdict":181},{"brief":166,"year":124},{"year":5,"edition":76,"phase":82,"label":83},{"id":453,"name":454,"area":10,"budget":435,"mandate":162,"briefs":455,"instroom":458,"projectId":459,"official":460,"project":463,"comparison":115},"midlife-update-mlu-zr-ms-johan-de-witt-lpd-2","Midlife Update (MLU) Zr. Ms. Johan de Witt (LPD-2)",[456,457],{"brief":95,"year":5},{"brief":64,"year":80},[65],"midlife-update-zr-ms-johan-de-witt",{"text":461,"source":462},"Bijlage IV Het investeringsprogramma … Maritiem … Midlife Update (MLU) Zr. Ms. Johan de Witt (LPD-2) … 25-100 miljoen",{"title":6,"url":41},{"id":459,"name":464,"steps":465,"newest":468},"Midlife Update Zr.Ms. Johan de Witt",[466,467],{"year":5,"edition":76,"phase":77,"label":78},{"year":124,"edition":277,"phase":82,"label":83},{"year":16,"edition":199,"phase":82,"label":83},{"id":470,"name":471,"area":10,"budget":435,"mandate":162,"briefs":472,"instroom":475,"projectId":476,"official":477,"project":480,"comparison":485},"aanvulling-standard-missile-2-block-iiia-sm2-iiia","Aanvulling Standard Missile 2 Block IIIA (SM2-IIIA)",[473,474],{"brief":95,"year":124},{"brief":166,"year":80},[65],"aanvulling-standard-missile-2-block-iiia",{"text":478,"source":479},"Bijlage IV Het investeringsprogramma … Maritiem … Aanvulling Standard Missile 2 Block IIIA (SM2-IIIA) … 25-100 miljoen",{"title":6,"url":41},{"id":476,"name":481,"steps":482,"newest":484},"Aanvulling Standard Missile 2 Block IIIA",[483],{"year":80,"edition":81,"phase":82,"label":83},{"year":16,"edition":199,"phase":82,"label":83},{"planned":486,"realisation":487,"yearsLater":30,"verdict":181},{"brief":166,"year":80},{"year":80,"edition":81,"phase":82,"label":83},{"id":489,"name":490,"area":10,"budget":435,"mandate":162,"briefs":491,"instroom":494,"official":495,"project":115,"comparison":115},"deelname-ontwikkeling-standard-missile-2-block-iiic-sm2-iiic","Deelname ontwikkeling Standard Missile 2 Block IIIC (SM2-IIIC)",[492,493],{"brief":95,"year":124},{"brief":166,"year":80},[65],{"text":496,"source":497},"Bijlage IV Het investeringsprogramma … Maritiem … Deelname ontwikkeling Standard Missile 2 Block IIIC (SM2-IIIC) … 25-100 miljoen",{"title":6,"url":41},{"id":499,"name":500,"area":10,"budget":435,"mandate":162,"briefs":501,"instroom":505,"official":506,"project":115,"comparison":115},"vervanging-self-propelled-variable-depth-sonar-spvds","Vervanging Self-Propelled Variable Depth Sonar (SPVDS)",[502,503,504],{"brief":95,"year":124},{"brief":62,"year":80},{"brief":64,"year":65},[16],{"text":507,"source":508},"Bijlage IV Het investeringsprogramma … Maritiem … Vervanging Self-Propelled Variable Depth Sonar (SPVDS) … 25-100 miljoen",{"title":6,"url":41},{"id":510,"name":511,"area":10,"budget":435,"mandate":162,"briefs":512,"instroom":516,"projectId":517,"official":518,"project":521,"comparison":526},"vervanging-fast-raiding-interception-and-special-forces-craft-frisc","Vervanging Fast Raiding, Interception and Special Forces Craft (FRISC)",[513,514,515],{"brief":95,"year":124},{"brief":62,"year":80},{"brief":64,"year":65},[25],"vervanging-en-instandhouding-fast-raiding-interception-and-special-for",{"text":519,"source":520},"Bijlage IV Het investeringsprogramma … Maritiem … Vervanging Fast Raiding, Interception and Special Forces Craft (FRISC) … 25-100 miljoen",{"title":6,"url":41},{"id":517,"name":522,"steps":523,"newest":525},"Vervanging en instandhouding Fast Raiding, Interception and Special Forces Craft (FRISC)",[524],{"year":16,"edition":199,"phase":77,"label":78},{"year":16,"edition":199,"phase":77,"label":78},{"planned":527,"realisation":115,"yearsLater":115,"verdict":116},{"brief":62,"year":80},{"id":529,"name":530,"area":10,"budget":435,"mandate":162,"briefs":531,"instroom":534,"official":535,"project":115,"comparison":115},"vervanging-marine-opleidings-vaartuig-mov-van-kinsbergen","Vervanging Marine Opleidings Vaartuig (MOV Van Kinsbergen)",[532,533],{"brief":95,"year":80},{"brief":166,"year":16},[99],{"text":536,"source":537},"Bijlage IV Het investeringsprogramma … Maritiem … Vervanging Marine Opleidings Vaartuig (MOV Van Kinsbergen) … 25-100 miljoen",{"title":6,"url":41},{"id":539,"name":540,"area":10,"budget":435,"mandate":162,"briefs":541,"instroom":544,"official":545,"project":115,"comparison":115},"vervanging-havenduikvaartuigen","Vervanging Havenduikvaartuigen",[542,543],{"brief":95,"year":16},{"brief":166,"year":25},[67],{"text":546,"source":547},"Bijlage IV Het investeringsprogramma … Maritiem … Vervanging Havenduikvaartuigen … 25-100 miljoen",{"title":6,"url":41},{"id":549,"name":550,"area":10,"budget":435,"mandate":162,"briefs":551,"instroom":554,"official":555,"project":115,"comparison":115},"vervanging-zr-ms-pelikaan-ondersteuningsschip-caribisch-gebied","Vervanging Zr. Ms. Pelikaan (Ondersteuningsschip Caribisch gebied)",[552,553],{"brief":95,"year":99},{"brief":166,"year":67},[235],{"text":556,"source":557},"Bijlage IV Het investeringsprogramma … Maritiem … Vervanging Zr. Ms. Pelikaan (Ondersteuningsschip Caribisch gebied) … 25-100 miljoen",{"title":6,"url":41},{"id":559,"name":560,"area":10,"budget":435,"mandate":162,"briefs":561,"instroom":564,"official":565,"project":115,"comparison":115},"vervanging-low-frequency-acoustic-sonar-lfas","Vervanging Low Frequency Acoustic Sonar (LFAS)",[562,563],{"brief":95,"year":99},{"brief":166,"year":67},[235],{"text":566,"source":567},"Bijlage IV Het investeringsprogramma … Maritiem … Vervanging Low Frequency Acoustic Sonar (LFAS) … 25-100 miljoen",{"title":6,"url":41},{"id":569,"name":570,"area":11,"budget":120,"briefs":571,"instroom":575,"official":576,"project":115,"comparison":115},"vervanging-fennek","Vervanging Fennek",[572,573,574],{"brief":95,"year":101},{"brief":62,"year":417},{"brief":64,"year":248},[47],{"text":577,"source":578},"Bijlage IV Het investeringsprogramma … Land … Vervanging Fennek … 1000-2500 miljoen",{"title":6,"url":41},{"id":580,"name":581,"area":11,"budget":144,"mandate":162,"briefs":582,"instroom":586,"projectId":587,"official":588,"project":591,"comparison":596},"midlife-update-mlu-cv90","Midlife Update (MLU) CV90",[583,584,585],{"brief":95,"year":5},{"brief":62,"year":80},{"brief":64,"year":65},[16],"midlife-update-mlu-voor-het-wapensysteem-infanterie-gevechtsvoertuig-i",{"text":589,"source":590},"Bijlage IV Het investeringsprogramma … Land … Midlife Update (MLU) CV90 … 250-1000 miljoen",{"title":6,"url":41},{"id":587,"name":592,"steps":593,"newest":595},"Midlife Update (MLU) voor het wapensysteem Infanterie gevechtsvoertuig (IGV) CV9035NL",[594],{"year":124,"edition":277,"phase":82,"label":83},{"year":32,"edition":112,"phase":82,"label":83},{"planned":597,"realisation":598,"yearsLater":180,"verdict":181},{"brief":62,"year":80},{"year":124,"edition":277,"phase":82,"label":83},{"id":600,"name":601,"area":11,"budget":144,"mandate":162,"briefs":602,"instroom":606,"projectId":600,"official":607,"project":610,"comparison":614},"midlife-update-mlu-fennek","Midlife Update (MLU) Fennek",[603,604,605],{"brief":95,"year":5},{"brief":62,"year":124},{"brief":64,"year":80},[65],{"text":608,"source":609},"Bijlage IV Het investeringsprogramma … Land … Midlife Update (MLU) Fennek … 250-1000 miljoen",{"title":6,"url":41},{"id":600,"name":601,"steps":611,"newest":613},[612],{"year":5,"edition":76,"phase":82,"label":83},{"year":32,"edition":112,"phase":82,"label":83},{"planned":615,"realisation":616,"yearsLater":180,"verdict":181},{"brief":62,"year":124},{"year":5,"edition":76,"phase":82,"label":83},{"id":618,"name":619,"area":11,"budget":144,"briefs":620,"instroom":624,"official":625,"project":115,"comparison":115},"vervanging-wissellaadsysteem","Vervanging Wissellaadsysteem",[621,622,623],{"brief":95,"year":124},{"brief":62,"year":80},{"brief":64,"year":65},[16],{"text":626,"source":627},"Bijlage IV Het investeringsprogramma … Land … Vervanging Wissellaadsysteem … 250-1000 miljoen",{"title":6,"url":41},{"id":629,"name":630,"area":11,"budget":144,"briefs":631,"instroom":635,"official":636,"project":115,"comparison":115},"vervanging-medium-en-short-range-anti-tank-mrat-srat","Vervanging Medium en Short Range Anti-Tank (MRAT\u002FSRAT)",[632,633,634],{"brief":95,"year":65},{"brief":62,"year":97},{"brief":64,"year":25},[99,101],{"text":637,"source":638},"Bijlage IV Het investeringsprogramma … Land … Vervanging Medium en Short Range Anti-Tank (MRAT\u002FSRAT) … 250-1000 miljoen",{"title":6,"url":41},{"id":640,"name":641,"area":11,"budget":144,"briefs":642,"instroom":646,"official":647,"project":115,"comparison":115},"vervanging-pantserhouwitzer-pzh","Vervanging Pantserhouwitzer (PzH)",[643,644,645],{"brief":95,"year":67},{"brief":62,"year":101},{"brief":64,"year":235},[417],{"text":648,"source":649},"Bijlage IV Het investeringsprogramma … Land … Vervanging Pantserhouwitzer (PzH) … 250-1000 miljoen",{"title":6,"url":41},{"id":651,"name":652,"area":11,"budget":255,"mandate":162,"briefs":653,"instroom":654,"projectId":655,"official":656,"project":659,"comparison":115},"verwerving-c-ram-class-1-uav-detectiecapaciteit","Verwerving C-RAM\u002FClass 1 UAV Detectiecapaciteit",[],[5],"c-ram-en-class-1-uav-detectiecapaciteit",{"text":657,"source":658},"Bijlage IV Het investeringsprogramma … Land … Verwerving C-RAM\u002FClass 1 UAV Detectiecapaciteit … 100-250 miljoen",{"title":6,"url":41},{"id":655,"name":660,"steps":661,"newest":663},"C-RAM en Class 1-UAV detectiecapaciteit",[662],{"year":5,"edition":76,"phase":82,"label":83},{"year":16,"edition":199,"phase":82,"label":83},{"id":665,"name":666,"area":11,"budget":255,"briefs":667,"instroom":668,"official":669,"project":115,"comparison":115},"vervanging-onderstel-brugleggende-tanks","Vervanging Onderstel Brugleggende Tanks",[],[5],{"text":670,"source":671},"Bijlage IV Het investeringsprogramma … Land … Vervanging Onderstel Brugleggende Tanks … 100-250 miljoen",{"title":6,"url":41},{"id":673,"name":674,"area":11,"budget":255,"briefs":675,"instroom":677,"projectId":678,"official":679,"project":682,"comparison":115},"verwerving-defensie-operationeel-kleding-systeem-doks","Verwerving Defensie Operationeel Kleding Systeem (DOKS)",[676],{"brief":64,"year":5},[124],"defensie-operationeel-kledingsysteem-doks",{"text":680,"source":681},"Bijlage IV Het investeringsprogramma … Land … Verwerving Defensie Operationeel Kleding Systeem (DOKS) … 100-250 miljoen",{"title":6,"url":41},{"id":678,"name":683,"steps":684,"newest":686},"Defensie Operationeel Kledingsysteem (DOKS)",[685],{"year":5,"edition":76,"phase":82,"label":83},{"year":32,"edition":112,"phase":82,"label":83},{"id":688,"name":689,"area":11,"budget":255,"briefs":690,"instroom":694,"official":695,"project":115,"comparison":115},"verwerving-very-short-range-air-defence-vshorad","Verwerving Very Short Range Air Defence (VSHORAD)",[691,692,693],{"brief":95,"year":124},{"brief":62,"year":80},{"brief":64,"year":65},[16],{"text":696,"source":697},"Bijlage IV Het investeringsprogramma … Land … Verwerving Very Short Range Air Defence (VSHORAD) … 100-250 miljoen",{"title":6,"url":41},{"id":699,"name":700,"area":11,"budget":255,"briefs":701,"instroom":705,"official":706,"project":115,"comparison":115},"vervanging-amarok","Vervanging Amarok",[702,703,704],{"brief":95,"year":65},{"brief":62,"year":16},{"brief":64,"year":97},[25],{"text":707,"source":708},"Bijlage IV Het investeringsprogramma … Land … Vervanging Amarok … 100-250 miljoen",{"title":6,"url":41},{"id":710,"name":711,"area":11,"budget":255,"briefs":712,"instroom":716,"official":717,"project":115,"comparison":115},"vervanging-bushmaster","Vervanging Bushmaster",[713,714,715],{"brief":95,"year":99},{"brief":62,"year":67},{"brief":64,"year":246},[101],{"text":718,"source":719},"Bijlage IV Het investeringsprogramma … Land … Vervanging Bushmaster … 100-250 miljoen",{"title":6,"url":41},{"id":721,"name":722,"area":12,"budget":59,"briefs":723,"instroom":724,"projectId":721,"official":725,"project":728,"comparison":115},"verwerving-f-35","Verwerving F-35",[],[124],{"text":726,"source":727},"Bijlage IV Het investeringsprogramma … Lucht … Verwerving F-35 … > 2,5 miljard",{"title":6,"url":41},{"id":721,"name":722,"steps":729,"newest":731},[730],{"year":5,"edition":76,"phase":82,"label":83},{"year":32,"edition":112,"phase":82,"label":83},{"id":733,"name":734,"area":12,"budget":144,"briefs":735,"instroom":736,"projectId":737,"official":738,"project":741,"comparison":115},"vervanging-en-modernisering-v-en-m-chinook","Vervanging en Modernisering (V&M) Chinook",[],[80],"chinook-vervanging-modernisering",{"text":739,"source":740},"Bijlage IV Het investeringsprogramma … Lucht … Vervanging en Modernisering (V&M) Chinook … 250-1000 miljoen",{"title":6,"url":41},{"id":737,"name":742,"steps":743,"newest":745},"Chinook Vervanging & Modernisering",[744],{"year":5,"edition":76,"phase":82,"label":83},{"year":32,"edition":112,"phase":82,"label":83},{"id":747,"name":748,"area":12,"budget":144,"briefs":749,"instroom":750,"projectId":751,"official":752,"project":755,"comparison":115},"verwerving-multi-role-tanker-transport-mrtt","Verwerving Multi Role Tanker Transport (MRTT)",[],[80],"vervanging-strategisch-luchttransport-en-aar-mrtt",{"text":753,"source":754},"Bijlage IV Het investeringsprogramma … Lucht … Verwerving Multi Role Tanker Transport (MRTT) … 250-1000 miljoen",{"title":6,"url":41},{"id":751,"name":756,"steps":757,"newest":759},"Vervanging strategisch luchttransport en AAR (MRTT)",[758],{"year":5,"edition":76,"phase":82,"label":83},{"year":32,"edition":112,"phase":82,"label":83},{"id":761,"name":762,"area":12,"budget":144,"briefs":763,"instroom":766,"projectId":761,"official":767,"project":770,"comparison":774},"apache-remanufacture","Apache Remanufacture",[764],{"brief":765,"year":5},"A\u002FD-brief",[16],{"text":768,"source":769},"Bijlage IV Het investeringsprogramma … Lucht … Apache Remanufacture … 250-1000 miljoen",{"title":6,"url":41},{"id":761,"name":762,"steps":771,"newest":773},[772],{"year":5,"edition":76,"phase":82,"label":83},{"year":32,"edition":112,"phase":82,"label":83},{"planned":775,"realisation":776,"yearsLater":30,"verdict":181},{"brief":765,"year":5},{"year":5,"edition":76,"phase":82,"label":83},{"id":778,"name":779,"area":12,"budget":144,"briefs":780,"instroom":783,"official":784,"project":115,"comparison":115},"vervanging-c-130","Vervanging C-130",[781,782],{"brief":95,"year":16},{"brief":62,"year":25},[417],{"text":785,"source":786},"Bijlage IV Het investeringsprogramma … Lucht … Vervanging C-130 … 250-1000 miljoen",{"title":6,"url":41},{"id":788,"name":789,"area":12,"budget":255,"briefs":790,"instroom":792,"projectId":793,"official":794,"project":797,"comparison":115},"verwerving-medium-altitude-long-endurance-unmanned-aerial-vehicle-male","Verwerving Medium Altitude Long Endurance Unmanned Aerial Vehicle (MALE UAV)",[791],{"brief":64,"year":5},[65],"medium-altitude-long-endurance-unmanned-aerial-vehicle-male-uav",{"text":795,"source":796},"Bijlage IV Het investeringsprogramma … Lucht … Verwerving Medium Altitude Long Endurance Unmanned Aerial Vehicle (MALE UAV) … 100-250 miljoen",{"title":6,"url":41},{"id":793,"name":798,"steps":799,"newest":801},"Medium Altitude Long Endurance Unmanned Aerial Vehicle (MALE UAV)",[800],{"year":5,"edition":76,"phase":82,"label":83},{"year":16,"edition":199,"phase":82,"label":83},{"id":803,"name":804,"area":12,"budget":255,"briefs":805,"instroom":809,"official":810,"project":115,"comparison":115},"block-upgrade-nh90","Block Upgrade NH90",[806,807,808],{"brief":95,"year":80},{"brief":62,"year":25},{"brief":64,"year":99},[32],{"text":811,"source":812},"Bijlage IV Het investeringsprogramma … Lucht … Block Upgrade NH90 … 100-250 miljoen",{"title":6,"url":41},{"id":814,"name":815,"area":12,"budget":255,"briefs":816,"instroom":820,"official":821,"project":115,"comparison":115},"vervanging-pc-7","Vervanging PC-7",[817,818,819],{"brief":95,"year":80},{"brief":62,"year":16},{"brief":64,"year":97},[99],{"text":822,"source":823},"Bijlage IV Het investeringsprogramma … Lucht … Vervanging PC-7 … 100-250 miljoen",{"title":6,"url":41},{"id":825,"name":826,"area":12,"budget":435,"mandate":162,"briefs":827,"instroom":830,"official":831,"project":115,"comparison":115},"verwerving-tactische-lucht-grond-bewapening-f-35","Verwerving Tactische Lucht-Grond Bewapening F-35",[828,829],{"brief":62,"year":5},{"brief":64,"year":124},[97],{"text":832,"source":833},"Bijlage IV Het investeringsprogramma … Lucht … Verwerving Tactische Lucht-Grond Bewapening F-35 … 25-100 miljoen",{"title":6,"url":41},{"id":835,"name":836,"area":12,"budget":435,"mandate":162,"briefs":837,"instroom":841,"projectId":842,"official":843,"project":846,"comparison":851},"multi-ship-multi-type-msmt-helicoptersimulator","Multi-Ship, Multi-Type (MSMT) Helicoptersimulator",[838,839,840],{"brief":95,"year":5},{"brief":62,"year":124},{"brief":64,"year":80},[16],"multi-ship-multi-type-msmt-helikopter-simulatoren",{"text":844,"source":845},"Bijlage IV Het investeringsprogramma … Lucht … Multi-Ship, Multi-Type (MSMT) Helicoptersimulator … 25-100 miljoen",{"title":6,"url":41},{"id":842,"name":847,"steps":848,"newest":850},"Multi Ship Multi Type (MSMT) Helikopter Simulatoren",[849],{"year":124,"edition":277,"phase":82,"label":83},{"year":32,"edition":112,"phase":82,"label":83},{"planned":852,"realisation":853,"yearsLater":30,"verdict":181},{"brief":62,"year":124},{"year":124,"edition":277,"phase":82,"label":83},{"id":855,"name":856,"area":12,"budget":435,"mandate":162,"briefs":857,"instroom":861,"official":862,"project":115,"comparison":115},"instandhoudingsprogramma-c-130","Instandhoudingsprogramma C-130",[858,859,860],{"brief":95,"year":124},{"brief":62,"year":80},{"brief":64,"year":65},[16],{"text":863,"source":864},"Bijlage IV Het investeringsprogramma … Lucht … Instandhoudingsprogramma C-130 … 25-100 miljoen",{"title":6,"url":41},{"id":866,"name":867,"area":12,"budget":435,"mandate":162,"briefs":868,"instroom":872,"official":873,"project":115,"comparison":115},"verwerving-strategische-lucht-grond-bewapening-f-35","Verwerving Strategische Lucht-Grond Bewapening F-35",[869,870,871],{"brief":95,"year":124},{"brief":62,"year":80},{"brief":64,"year":65},[25],{"text":874,"source":875},"Bijlage IV Het investeringsprogramma … Lucht … Verwerving Strategische Lucht-Grond Bewapening F-35 … 25-100 miljoen",{"title":6,"url":41},{"id":877,"name":878,"area":12,"budget":435,"mandate":162,"briefs":879,"instroom":883,"official":884,"project":115,"comparison":115},"verwerving-piloting-forward-looking-infra-red-pflir-nh-90","Verwerving Piloting Forward Looking Infra-Red (PFLIR) NH-90",[880,881,882],{"brief":95,"year":80},{"brief":62,"year":65},{"brief":64,"year":16},[25],{"text":885,"source":886},"Bijlage IV Het investeringsprogramma … Lucht … Verwerving Piloting Forward Looking Infra-Red (PFLIR) NH-90 … 25-100 miljoen",{"title":6,"url":41},{"id":888,"name":889,"area":12,"budget":435,"mandate":162,"briefs":890,"instroom":893,"projectId":894,"official":895,"project":898,"comparison":903},"vervanging-gulfstream","Vervanging Gulfstream",[891,892],{"brief":95,"year":80},{"brief":166,"year":65},[16],"vervanging-gulfstream-iv",{"text":896,"source":897},"Bijlage IV Het investeringsprogramma … Lucht … Vervanging Gulfstream … 25-100 miljoen",{"title":6,"url":41},{"id":894,"name":899,"steps":900,"newest":902},"Vervanging Gulfstream IV",[901],{"year":80,"edition":81,"phase":82,"label":83},{"year":97,"edition":158,"phase":82,"label":83},{"planned":904,"realisation":905,"yearsLater":180,"verdict":181},{"brief":166,"year":65},{"year":80,"edition":81,"phase":82,"label":83},{"id":907,"name":908,"area":13,"budget":144,"briefs":909,"instroom":912,"official":913,"project":115,"comparison":115},"aanvullen-munitievoorraden","Aanvullen Munitievoorraden",[910,911],{"brief":95,"year":5},{"brief":62,"year":124},[80],{"text":914,"source":915},"Bijlage IV Het investeringsprogramma … Defensiebreed … Aanvullen Munitievoorraden … 250-1000 miljoen",{"title":6,"url":41},{"id":917,"name":918,"area":13,"budget":255,"mandate":162,"briefs":919,"instroom":922,"projectId":917,"official":923,"project":926,"comparison":932},"vervanging-gevechtsuitrusting","Vervanging Gevechtsuitrusting",[920,921],{"brief":95,"year":5},{"brief":166,"year":124},[80],{"text":924,"source":925},"Bijlage IV Het investeringsprogramma … Defensiebreed … Vervanging Gevechtsuitrusting … 100-250 miljoen",{"title":6,"url":41},{"id":917,"name":927,"steps":928,"newest":931},"Vervanging gevechtsuitrusting",[929,930],{"year":5,"edition":76,"phase":77,"label":78},{"year":80,"edition":81,"phase":82,"label":83},{"year":16,"edition":199,"phase":82,"label":83},{"planned":933,"realisation":934,"yearsLater":140,"verdict":89},{"brief":166,"year":124},{"year":80,"edition":81,"phase":82,"label":83},{"id":936,"name":937,"area":13,"budget":255,"briefs":938,"instroom":942,"official":943,"project":115,"comparison":115},"vervanging-klein-kaliber-wapens-kkw","Vervanging Klein Kaliber Wapens (KKW)",[939,940,941],{"brief":95,"year":16},{"brief":62,"year":25},{"brief":64,"year":99},[32],{"text":944,"source":945},"Bijlage IV Het investeringsprogramma … Defensiebreed … Vervanging Klein Kaliber Wapens (KKW) … 100-250 miljoen",{"title":6,"url":41},{"id":947,"name":948,"area":13,"budget":255,"briefs":949,"instroom":950,"projectId":951,"official":952,"project":955,"comparison":115},"verwerving-defensie-bewaking-en-beveiligingsssysteem-dbbs","Verwerving Defensie Bewaking- en Beveiligingsssysteem (DBBS)",[],[16],"defensie-bewakings-en-beveiligingssysteem-dbbs",{"text":953,"source":954},"Bijlage IV Het investeringsprogramma … Defensiebreed … Verwerving Defensie Bewaking- en Beveiligingsssysteem (DBBS) … 100-250 miljoen",{"title":6,"url":41},{"id":951,"name":956,"steps":957,"newest":959},"Defensie Bewakings- en Beveiligingssysteem (DBBS)",[958],{"year":5,"edition":76,"phase":82,"label":83},{"year":32,"edition":112,"phase":82,"label":83},{"id":961,"name":962,"area":13,"budget":255,"briefs":963,"instroom":967,"official":968,"project":115,"comparison":115},"vervanging-verbeterd-operationeel-soldaat-systeem-voss","Vervanging Verbeterd Operationeel Soldaat Systeem (VOSS)",[964,965,966],{"brief":95,"year":246},{"brief":62,"year":101},{"brief":64,"year":235},[417],{"text":969,"source":970},"Bijlage IV Het investeringsprogramma … Defensiebreed … Vervanging Verbeterd Operationeel Soldaat Systeem (VOSS) … 100-250 miljoen",{"title":6,"url":41},{"id":972,"name":973,"area":13,"budget":435,"mandate":162,"briefs":974,"instroom":977,"official":978,"project":115,"comparison":115},"operationele-infra-en-geneeskundige-verbruiksgoederen","Operationele Infra en Geneeskundige Verbruiksgoederen",[975,976],{"brief":95,"year":5},{"brief":166,"year":124},[80],{"text":979,"source":980},"Bijlage IV Het investeringsprogramma … Defensiebreed … Operationele Infra en Geneeskundige Verbruiksgoederen … 25-100 miljoen",{"title":6,"url":41},{"id":982,"name":983,"area":13,"budget":435,"mandate":162,"briefs":984,"instroom":987,"official":988,"project":115,"comparison":115},"defensiebrede-vervanging-handgedragen-warmtebeeldkijker","Defensiebrede Vervanging Handgedragen Warmtebeeldkijker",[985,986],{"brief":95,"year":99},{"brief":64,"year":32},[67],{"text":989,"source":990},"Bijlage IV Het investeringsprogramma … Defensiebreed … Defensiebrede Vervanging Handgedragen Warmtebeeldkijker … 25-100 miljoen",{"title":6,"url":41},"2026-10-26",{"version":993,"updated":994,"site":995,"stories":30},"a5aa98ac1492b6ba","2026-11-18",{"commit":996,"date":997},"f99fe458","2026-11-19"]