[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"$fwa5jg1uq5ehb":3,"meta":37,"plans-2018":42},[4,15,24,31],{"year":5,"title":6,"plans":7,"linked":8,"areas":9,"compared":14},2018,"Defensienota 2018 – investeren in onze mensen, slagkracht en zichtbaarheid",65,29,[10,11,12,13],"maritiem","land","lucht","defensiebreed",19,{"year":16,"title":17,"plans":18,"linked":19,"areas":20,"compared":23},2022,"Defensienota 2022 – Sterker Nederland, veiliger Europa",201,113,[13,10,11,12,21,22],"infrastructuur","it",5,{"year":25,"title":26,"plans":27,"linked":28,"areas":29,"compared":30},2024,"Defensienota 2024: Sterk, slim en samen",21,9,[11,10,12,13],0,{"year":32,"title":33,"plans":34,"linked":30,"areas":35,"compared":30},2026,"Defensienota 2026 – Samen voorwaarts!",12,[13,10,12,11,36,22],"marechaussee",{"version":38,"updated":39,"site":40},"91dea28b61eea934","2026-11-04",{"commit":41,"date":39},"f3a05675",{"id":43,"year":5,"title":6,"published":44,"source":45,"sha256":47,"table":48,"about":53,"plans":60,"updated":996,"overviewYear":32,"hasOverviewAfter":167},"defensienota-2018","2018-03-28",{"title":6,"url":46},"https:\u002F\u002Fzoek.officielebekendmakingen.nl\u002Fblg-836989.pdf","6e7e5b10980cd6ad1ce719803aed1326f4946b0e9d518f92f1f8f668c3904f1f",{"title":49,"pages":50,"years":51},"Bijlage IV Het investeringsprogramma","27–28",[5,52],2033,[54,57],{"text":55,"source":56},"In bijlage IV is het investeringsprogramma te vinden met alle vervangings- en vernieuwingsinvesteringen (boven de 25 miljoen euro) voor de komende vijftien jaar.",{"title":6,"url":46},{"text":58,"source":59},"Conform het Defensie Materieel Proces (DMP) zal de Tweede Kamer per project ter informatie brieven over de behoeftestelling (A-brief), de onderzoeksfase (B-brief) en eventueel vervolgonderzoek (C-brief) ontvangen. Verwervingsbesluiten (D-brief) worden ter behandeling aan de Tweede Kamer voorgelegd.",{"title":6,"url":46},[61,95,122,146,164,187,210,221,232,244,257,266,287,300,311,332,354,373,384,403,414,426,437,457,474,493,503,514,533,543,553,563,573,584,604,622,633,644,655,669,677,692,703,714,725,737,751,765,782,792,807,818,829,839,859,870,881,892,911,921,940,951,965,976,986],{"id":62,"name":63,"area":10,"budget":64,"briefs":65,"instroom":71,"projectId":73,"official":74,"project":77,"comparison":90},"vervanging-onderzeebootcapaciteit-ozbt","Vervanging Onderzeebootcapaciteit (OZBT)","> 2,5 miljard",[66,68],{"brief":67,"year":5},"B-brief",{"brief":69,"year":70},"D-brief",2021,[72],2027,"vervanging-onderzeebootcapaciteit",{"text":75,"source":76},"Bijlage IV Het investeringsprogramma … Maritiem … Vervanging Onderzeebootcapaciteit (OZBT) … > 2,5 miljard",{"title":6,"url":46},{"id":73,"name":78,"steps":79,"newest":89},"Vervanging onderzeebootcapaciteit",[80,84],{"year":5,"edition":81,"phase":82,"label":83},"MPO 2018","onderzoek","In onderzoek",{"year":85,"edition":86,"phase":87,"label":88},2020,"DPO 2020","realisatie","In realisatie",{"year":85,"edition":86,"phase":87,"label":88},{"planned":91,"realisation":92,"yearsLater":93,"verdict":94},{"brief":67,"year":5},{"year":85,"edition":86,"phase":87,"label":88},2,"later",{"id":96,"name":97,"area":10,"budget":64,"briefs":98,"instroom":105,"projectId":107,"official":108,"project":111,"comparison":118},"vervanging-luchtverdedigings-en-commando-fregatten-lcf-incl-studies","Vervanging Luchtverdedigings- en Commando Fregatten (LCF) (incl. studies)",[99,101,103],{"brief":100,"year":70},"A-brief",{"brief":67,"year":102},2023,{"brief":69,"year":104},2025,[106],2029,"vervanging-lc-fregatten",{"text":109,"source":110},"Bijlage IV Het investeringsprogramma … Maritiem … Vervanging Luchtverdedigings- en Commando Fregatten (LCF) (incl. studies) … > 2,5 miljard",{"title":6,"url":46},{"id":107,"name":112,"steps":113,"newest":116},"Vervanging LC-fregatten",[114],{"year":25,"edition":115,"phase":82,"label":83},"DPO 2024",{"year":32,"edition":117,"phase":82,"label":83},"DPO 2026",{"planned":119,"realisation":120,"yearsLater":120,"verdict":121},{"brief":67,"year":102},null,"nog-niet",{"id":123,"name":124,"area":10,"budget":125,"briefs":126,"instroom":131,"projectId":132,"official":133,"project":136,"comparison":142},"vervanging-multipurpose-fregat-mff","Vervanging Multipurpose Fregat (MFF)","1000-2500 miljoen",[127,128,130],{"brief":100,"year":5},{"brief":67,"year":129},2019,{"brief":69,"year":85},[25],"vervanging-m-fregatten-aswf",{"text":134,"source":135},"Bijlage IV Het investeringsprogramma … Maritiem … Vervanging Multipurpose Fregat (MFF) … 1000-2500 miljoen",{"title":6,"url":46},{"id":132,"name":137,"steps":138,"newest":141},"Vervanging M-fregatten (ASWF)",[139,140],{"year":5,"edition":81,"phase":82,"label":83},{"year":85,"edition":86,"phase":87,"label":88},{"year":32,"edition":117,"phase":87,"label":88},{"planned":143,"realisation":144,"yearsLater":145,"verdict":94},{"brief":67,"year":129},{"year":85,"edition":86,"phase":87,"label":88},1,{"id":147,"name":148,"area":10,"budget":149,"briefs":150,"instroom":153,"projectId":154,"official":155,"project":158,"comparison":120},"vervanging-maritime-counter-mines-mcm-capaciteit","Vervanging Maritime Counter Mines (MCM) Capaciteit","250-1000 miljoen",[151,152],{"brief":100,"year":5},{"brief":69,"year":129},[25],"vervanging-mijnenbestrijdingscapaciteit",{"text":156,"source":157},"Bijlage IV Het investeringsprogramma … Maritiem … Vervanging Maritime Counter Mines (MCM) Capaciteit … 250-1000 miljoen",{"title":6,"url":46},{"id":154,"name":159,"steps":160,"newest":162},"Vervanging mijnenbestrijdingscapaciteit",[161],{"year":5,"edition":81,"phase":87,"label":88},{"year":102,"edition":163,"phase":87,"label":88},"DPO 2023",{"id":165,"name":166,"area":10,"budget":149,"mandate":167,"briefs":168,"instroom":172,"projectId":173,"official":174,"project":177,"comparison":182},"verwerving-combat-support-ship-css","Verwerving Combat Support Ship (CSS)",true,[169,170],{"brief":100,"year":5},{"brief":171,"year":129},"B\u002FD-brief",[16],"verwerving-combat-support-ship",{"text":175,"source":176},"Bijlage IV Het investeringsprogramma … Maritiem … Verwerving Combat Support Ship (CSS) … 250-1000 miljoen",{"title":6,"url":46},{"id":173,"name":178,"steps":179,"newest":181},"Verwerving Combat Support Ship",[180],{"year":5,"edition":81,"phase":87,"label":88},{"year":32,"edition":117,"phase":87,"label":88},{"planned":183,"realisation":184,"yearsLater":185,"verdict":186},{"brief":171,"year":129},{"year":5,"edition":81,"phase":87,"label":88},-1,"op-tijd",{"id":188,"name":189,"area":10,"budget":149,"briefs":190,"instroom":194,"projectId":195,"official":196,"project":199,"comparison":206},"verwerving-en-integratie-evolved-sea-sparrow-missile-essm-block-2","Verwerving & Integratie Evolved Sea Sparrow Missile (ESSM) Block 2",[191,192,193],{"brief":100,"year":5},{"brief":67,"year":129},{"brief":69,"year":85},[16],"essm-block-2-verwerving-en-integratie",{"text":197,"source":198},"Bijlage IV Het investeringsprogramma … Maritiem … Verwerving & Integratie Evolved Sea Sparrow Missile (ESSM) Block 2 … 250-1000 miljoen",{"title":6,"url":46},{"id":195,"name":200,"steps":201,"newest":205},"ESSM Block 2: Verwerving en integratie",[202,203],{"year":5,"edition":81,"phase":82,"label":83},{"year":16,"edition":204,"phase":87,"label":88},"DPO 2022",{"year":32,"edition":117,"phase":87,"label":88},{"planned":207,"realisation":208,"yearsLater":209,"verdict":94},{"brief":67,"year":129},{"year":16,"edition":204,"phase":87,"label":88},3,{"id":211,"name":212,"area":10,"budget":149,"briefs":213,"instroom":217,"official":218,"project":120,"comparison":120},"vervanging-all-terrain-vehicle-atv","Vervanging All Terrain Vehicle (ATV)",[214,215,216],{"brief":100,"year":129},{"brief":67,"year":70},{"brief":69,"year":16},[25],{"text":219,"source":220},"Bijlage IV Het investeringsprogramma … Maritiem … Vervanging All Terrain Vehicle (ATV) … 250-1000 miljoen",{"title":6,"url":46},{"id":222,"name":223,"area":10,"budget":149,"briefs":224,"instroom":228,"official":229,"project":120,"comparison":120},"vervanging-standard-missile-2-block-iiia-sm2-iiia","Vervanging Standard Missile 2 Block IIIA (SM2-IIIA)",[225,226,227],{"brief":100,"year":102},{"brief":67,"year":104},{"brief":69,"year":32},[106],{"text":230,"source":231},"Bijlage IV Het investeringsprogramma … Maritiem … Vervanging Standard Missile 2 Block IIIA (SM2-IIIA) … 250-1000 miljoen",{"title":6,"url":46},{"id":233,"name":234,"area":10,"budget":149,"briefs":235,"instroom":239,"official":241,"project":120,"comparison":120},"vervanging-zr-ms-rotterdam-lpd-1","Vervanging Zr. Ms. Rotterdam (LPD-1)",[236,237,238],{"brief":100,"year":102},{"brief":67,"year":104},{"brief":69,"year":32},[240],2030,{"text":242,"source":243},"Bijlage IV Het investeringsprogramma … Maritiem … Vervanging Zr. Ms. Rotterdam (LPD-1) … 250-1000 miljoen",{"title":6,"url":46},{"id":245,"name":246,"area":10,"budget":149,"briefs":247,"instroom":252,"official":254,"project":120,"comparison":120},"vervanging-zr-ms-johan-de-witt-lpd-2","Vervanging Zr. Ms. Johan de Witt (LPD-2)",[248,249,250],{"brief":100,"year":104},{"brief":67,"year":72},{"brief":69,"year":251},2028,[253],2032,{"text":255,"source":256},"Bijlage IV Het investeringsprogramma … Maritiem … Vervanging Zr. Ms. Johan de Witt (LPD-2) … 250-1000 miljoen",{"title":6,"url":46},{"id":258,"name":259,"area":10,"budget":260,"briefs":261,"instroom":262,"official":263,"project":120,"comparison":120},"midlife-update-mlu-luchtverdedigings-en-commando-fregatten-lcf","Midlife Update (MLU) Luchtverdedigings- en Commando Fregatten (LCF)","100-250 miljoen",[],[5],{"text":264,"source":265},"Bijlage IV Het investeringsprogramma … Maritiem … Midlife Update (MLU) Luchtverdedigings- en Commando Fregatten (LCF) … 100-250 miljoen",{"title":6,"url":46},{"id":267,"name":268,"area":10,"budget":260,"mandate":167,"briefs":269,"instroom":272,"projectId":273,"official":274,"project":277,"comparison":284},"vervanging-kanons-luchtverdedigings-en-commando-fregatten-lcf","Vervanging Kanons Luchtverdedigings- en Commando Fregatten (LCF)",[270,271],{"brief":100,"year":5},{"brief":171,"year":129},[85],"vervanging-127-mm-kanon-luchtverdedigings-en-commandofregatten",{"text":275,"source":276},"Bijlage IV Het investeringsprogramma … Maritiem … Vervanging Kanons Luchtverdedigings- en Commando Fregatten (LCF) … 100-250 miljoen",{"title":6,"url":46},{"id":273,"name":278,"steps":279,"newest":283},"Vervanging 127 mm kanon Luchtverdedigings- en Commandofregatten",[280,281],{"year":5,"edition":81,"phase":82,"label":83},{"year":129,"edition":282,"phase":87,"label":88},"DPO 2019",{"year":32,"edition":117,"phase":87,"label":88},{"planned":285,"realisation":286,"yearsLater":30,"verdict":186},{"brief":171,"year":129},{"year":129,"edition":282,"phase":87,"label":88},{"id":288,"name":289,"area":10,"budget":260,"briefs":290,"instroom":291,"projectId":288,"official":292,"project":295,"comparison":120},"vervanging-mk46-lightweight-torpedo","Vervanging MK46 Lightweight Torpedo",[],[85],{"text":293,"source":294},"Bijlage IV Het investeringsprogramma … Maritiem … Vervanging MK46 Lightweight Torpedo … 100-250 miljoen",{"title":6,"url":46},{"id":288,"name":296,"steps":297,"newest":299},"Vervanging MK46 Lightweight torpedo",[298],{"year":5,"edition":81,"phase":87,"label":88},{"year":32,"edition":117,"phase":87,"label":88},{"id":301,"name":302,"area":10,"budget":260,"mandate":167,"briefs":303,"instroom":307,"official":308,"project":120,"comparison":120},"verwerving-torpedo-defensiesysteem-vlootbreed","Verwerving Torpedo Defensiesysteem (vlootbreed)",[304,305,306],{"brief":100,"year":5},{"brief":67,"year":129},{"brief":69,"year":85},[70],{"text":309,"source":310},"Bijlage IV Het investeringsprogramma … Maritiem … Verwerving Torpedo Defensiesysteem (vlootbreed) … 100-250 miljoen",{"title":6,"url":46},{"id":312,"name":313,"area":10,"budget":260,"mandate":167,"briefs":314,"instroom":318,"projectId":319,"official":320,"project":323,"comparison":329},"vervanging-harpoon-missile-surface-to-surface-missile","Vervanging Harpoon Missile (surface-to-surface missile)",[315,316,317],{"brief":100,"year":5},{"brief":67,"year":129},{"brief":69,"year":85},[102],"vervanging-maritiem-surface-to-surface-missile",{"text":321,"source":322},"Bijlage IV Het investeringsprogramma … Maritiem … Vervanging Harpoon Missile (surface-to-surface missile) … 100-250 miljoen",{"title":6,"url":46},{"id":319,"name":324,"steps":325,"newest":328},"Vervanging Maritiem Surface-to-surface missile",[326,327],{"year":5,"edition":81,"phase":82,"label":83},{"year":85,"edition":86,"phase":87,"label":88},{"year":32,"edition":117,"phase":87,"label":88},{"planned":330,"realisation":331,"yearsLater":145,"verdict":94},{"brief":67,"year":129},{"year":85,"edition":86,"phase":87,"label":88},{"id":333,"name":334,"area":10,"budget":260,"briefs":335,"instroom":339,"projectId":340,"official":341,"project":344,"comparison":351},"vervanging-goalkeeper-close-in-weapon-system","Vervanging Goalkeeper (Close-in Weapon System)",[336,337,338],{"brief":100,"year":5},{"brief":67,"year":129},{"brief":69,"year":85},[102],"vervanging-close-in-weapon-system-vciws",{"text":342,"source":343},"Bijlage IV Het investeringsprogramma … Maritiem … Vervanging Goalkeeper (Close-in Weapon System) … 100-250 miljoen",{"title":6,"url":46},{"id":340,"name":345,"steps":346,"newest":350},"Vervanging Close-in Weapon System (vCIWS)",[347,348],{"year":5,"edition":81,"phase":82,"label":83},{"year":70,"edition":349,"phase":87,"label":88},"DPO 2021",{"year":32,"edition":117,"phase":87,"label":88},{"planned":352,"realisation":353,"yearsLater":93,"verdict":94},{"brief":67,"year":129},{"year":70,"edition":349,"phase":87,"label":88},{"id":355,"name":356,"area":10,"budget":260,"briefs":357,"instroom":361,"projectId":355,"official":362,"project":365,"comparison":370},"vervanging-middelzwaar-landingsvaartuig-lcvp","Vervanging Middelzwaar Landingsvaartuig (LCVP)",[358,359,360],{"brief":100,"year":85},{"brief":67,"year":70},{"brief":69,"year":16},[25],{"text":363,"source":364},"Bijlage IV Het investeringsprogramma … Maritiem … Vervanging Middelzwaar Landingsvaartuig (LCVP) … 100-250 miljoen",{"title":6,"url":46},{"id":355,"name":366,"steps":367,"newest":369},"Vervanging middelzwaar landingsvaartuig (LCVP)",[368],{"year":102,"edition":163,"phase":87,"label":88},{"year":32,"edition":117,"phase":87,"label":88},{"planned":371,"realisation":372,"yearsLater":93,"verdict":94},{"brief":67,"year":70},{"year":102,"edition":163,"phase":87,"label":88},{"id":374,"name":375,"area":10,"budget":260,"briefs":376,"instroom":380,"official":381,"project":120,"comparison":120},"vervanging-zr-ms-mercuur-en-hydrografische-opname-vaartuigen-hovs","Vervanging Zr. Ms. Mercuur & Hydrografische Opname Vaartuigen (HOVs)",[377,378,379],{"brief":100,"year":85},{"brief":67,"year":70},{"brief":69,"year":16},[32,52],{"text":382,"source":383},"Bijlage IV Het investeringsprogramma … Maritiem … Vervanging Zr. Ms. Mercuur & Hydrografische Opname Vaartuigen (HOVs) … 100-250 miljoen",{"title":6,"url":46},{"id":385,"name":386,"area":10,"budget":260,"briefs":387,"instroom":391,"projectId":385,"official":392,"project":395,"comparison":400},"midlife-update-mlu-oceangoing-patrol-vessel-opv","Midlife Update (MLU) Oceangoing Patrol Vessel (OPV)",[388,389,390],{"brief":100,"year":70},{"brief":67,"year":16},{"brief":69,"year":102},[104],{"text":393,"source":394},"Bijlage IV Het investeringsprogramma … Maritiem … Midlife Update (MLU) Oceangoing Patrol Vessel (OPV) … 100-250 miljoen",{"title":6,"url":46},{"id":385,"name":386,"steps":396,"newest":399},[397,398],{"year":16,"edition":204,"phase":82,"label":83},{"year":102,"edition":163,"phase":87,"label":88},{"year":32,"edition":117,"phase":87,"label":88},{"planned":401,"realisation":402,"yearsLater":145,"verdict":94},{"brief":67,"year":16},{"year":102,"edition":163,"phase":87,"label":88},{"id":404,"name":405,"area":10,"budget":260,"briefs":406,"instroom":410,"official":411,"project":120,"comparison":120},"midlife-update-mlu-zr-ms-karel-doorman-joint-support-ship-jss","Midlife Update (MLU) Zr. Ms. Karel Doorman (Joint Support Ship, JSS)",[407,408,409],{"brief":100,"year":16},{"brief":67,"year":25},{"brief":69,"year":104},[251],{"text":412,"source":413},"Bijlage IV Het investeringsprogramma … Maritiem … Midlife Update (MLU) Zr. Ms. Karel Doorman (Joint Support Ship, JSS) … 100-250 miljoen",{"title":6,"url":46},{"id":415,"name":416,"area":10,"budget":260,"briefs":417,"instroom":421,"official":423,"project":120,"comparison":120},"vervanging-mk48-heavyweight-torpedo","Vervanging MK48 Heavyweight Torpedo",[418,419,420],{"brief":100,"year":25},{"brief":67,"year":32},{"brief":69,"year":251},[422],2031,{"text":424,"source":425},"Bijlage IV Het investeringsprogramma … Maritiem … Vervanging MK48 Heavyweight Torpedo … 100-250 miljoen",{"title":6,"url":46},{"id":427,"name":428,"area":10,"budget":260,"briefs":429,"instroom":433,"official":434,"project":120,"comparison":120},"vervanging-zwaar-landingsvaartuig-lcu","Vervanging Zwaar Landingsvaartuig (LCU)",[430,431,432],{"brief":100,"year":104},{"brief":67,"year":72},{"brief":69,"year":251},[422],{"text":435,"source":436},"Bijlage IV Het investeringsprogramma … Maritiem … Vervanging Zwaar Landingsvaartuig (LCU) … 100-250 miljoen",{"title":6,"url":46},{"id":438,"name":439,"area":10,"budget":440,"mandate":167,"briefs":441,"instroom":444,"projectId":445,"official":446,"project":449,"comparison":454},"midlife-update-mlu-hydrografische-opname-vaartuigen-hovs","Midlife Update (MLU) Hydrografische Opname Vaartuigen (HOVs)","25-100 miljoen",[442,443],{"brief":100,"year":5},{"brief":171,"year":129},[85],"midlife-update-hydrografische-opnemingsvaartuigen",{"text":447,"source":448},"Bijlage IV Het investeringsprogramma … Maritiem … Midlife Update (MLU) Hydrografische Opname Vaartuigen (HOVs) … 25-100 miljoen",{"title":6,"url":46},{"id":445,"name":450,"steps":451,"newest":453},"Midlife Update Hydrografische Opnemingsvaartuigen",[452],{"year":5,"edition":81,"phase":87,"label":88},{"year":70,"edition":349,"phase":87,"label":88},{"planned":455,"realisation":456,"yearsLater":185,"verdict":186},{"brief":171,"year":129},{"year":5,"edition":81,"phase":87,"label":88},{"id":458,"name":459,"area":10,"budget":440,"mandate":167,"briefs":460,"instroom":463,"projectId":464,"official":465,"project":468,"comparison":120},"midlife-update-mlu-zr-ms-johan-de-witt-lpd-2","Midlife Update (MLU) Zr. Ms. Johan de Witt (LPD-2)",[461,462],{"brief":100,"year":5},{"brief":69,"year":85},[70],"midlife-update-zr-ms-johan-de-witt",{"text":466,"source":467},"Bijlage IV Het investeringsprogramma … Maritiem … Midlife Update (MLU) Zr. Ms. Johan de Witt (LPD-2) … 25-100 miljoen",{"title":6,"url":46},{"id":464,"name":469,"steps":470,"newest":473},"Midlife Update Zr.Ms. Johan de Witt",[471,472],{"year":5,"edition":81,"phase":82,"label":83},{"year":129,"edition":282,"phase":87,"label":88},{"year":16,"edition":204,"phase":87,"label":88},{"id":475,"name":476,"area":10,"budget":440,"mandate":167,"briefs":477,"instroom":480,"projectId":481,"official":482,"project":485,"comparison":490},"aanvulling-standard-missile-2-block-iiia-sm2-iiia","Aanvulling Standard Missile 2 Block IIIA (SM2-IIIA)",[478,479],{"brief":100,"year":129},{"brief":171,"year":85},[70],"aanvulling-standard-missile-2-block-iiia",{"text":483,"source":484},"Bijlage IV Het investeringsprogramma … Maritiem … Aanvulling Standard Missile 2 Block IIIA (SM2-IIIA) … 25-100 miljoen",{"title":6,"url":46},{"id":481,"name":486,"steps":487,"newest":489},"Aanvulling Standard Missile 2 Block IIIA",[488],{"year":85,"edition":86,"phase":87,"label":88},{"year":16,"edition":204,"phase":87,"label":88},{"planned":491,"realisation":492,"yearsLater":30,"verdict":186},{"brief":171,"year":85},{"year":85,"edition":86,"phase":87,"label":88},{"id":494,"name":495,"area":10,"budget":440,"mandate":167,"briefs":496,"instroom":499,"official":500,"project":120,"comparison":120},"deelname-ontwikkeling-standard-missile-2-block-iiic-sm2-iiic","Deelname ontwikkeling Standard Missile 2 Block IIIC (SM2-IIIC)",[497,498],{"brief":100,"year":129},{"brief":171,"year":85},[70],{"text":501,"source":502},"Bijlage IV Het investeringsprogramma … Maritiem … Deelname ontwikkeling Standard Missile 2 Block IIIC (SM2-IIIC) … 25-100 miljoen",{"title":6,"url":46},{"id":504,"name":505,"area":10,"budget":440,"mandate":167,"briefs":506,"instroom":510,"official":511,"project":120,"comparison":120},"vervanging-self-propelled-variable-depth-sonar-spvds","Vervanging Self-Propelled Variable Depth Sonar (SPVDS)",[507,508,509],{"brief":100,"year":129},{"brief":67,"year":85},{"brief":69,"year":70},[16],{"text":512,"source":513},"Bijlage IV Het investeringsprogramma … Maritiem … Vervanging Self-Propelled Variable Depth Sonar (SPVDS) … 25-100 miljoen",{"title":6,"url":46},{"id":515,"name":516,"area":10,"budget":440,"mandate":167,"briefs":517,"instroom":521,"projectId":522,"official":523,"project":526,"comparison":531},"vervanging-fast-raiding-interception-and-special-forces-craft-frisc","Vervanging Fast Raiding, Interception and Special Forces Craft (FRISC)",[518,519,520],{"brief":100,"year":129},{"brief":67,"year":85},{"brief":69,"year":70},[25],"vervanging-en-instandhouding-fast-raiding-interception-and-special-for",{"text":524,"source":525},"Bijlage IV Het investeringsprogramma … Maritiem … Vervanging Fast Raiding, Interception and Special Forces Craft (FRISC) … 25-100 miljoen",{"title":6,"url":46},{"id":522,"name":527,"steps":528,"newest":530},"Vervanging en instandhouding Fast Raiding, Interception and Special Forces Craft (FRISC)",[529],{"year":16,"edition":204,"phase":82,"label":83},{"year":16,"edition":204,"phase":82,"label":83},{"planned":532,"realisation":120,"yearsLater":120,"verdict":121},{"brief":67,"year":85},{"id":534,"name":535,"area":10,"budget":440,"mandate":167,"briefs":536,"instroom":539,"official":540,"project":120,"comparison":120},"vervanging-marine-opleidings-vaartuig-mov-van-kinsbergen","Vervanging Marine Opleidings Vaartuig (MOV Van Kinsbergen)",[537,538],{"brief":100,"year":85},{"brief":171,"year":16},[104],{"text":541,"source":542},"Bijlage IV Het investeringsprogramma … Maritiem … Vervanging Marine Opleidings Vaartuig (MOV Van Kinsbergen) … 25-100 miljoen",{"title":6,"url":46},{"id":544,"name":545,"area":10,"budget":440,"mandate":167,"briefs":546,"instroom":549,"official":550,"project":120,"comparison":120},"vervanging-havenduikvaartuigen","Vervanging Havenduikvaartuigen",[547,548],{"brief":100,"year":16},{"brief":171,"year":25},[72],{"text":551,"source":552},"Bijlage IV Het investeringsprogramma … Maritiem … Vervanging Havenduikvaartuigen … 25-100 miljoen",{"title":6,"url":46},{"id":554,"name":555,"area":10,"budget":440,"mandate":167,"briefs":556,"instroom":559,"official":560,"project":120,"comparison":120},"vervanging-zr-ms-pelikaan-ondersteuningsschip-caribisch-gebied","Vervanging Zr. Ms. Pelikaan (Ondersteuningsschip Caribisch gebied)",[557,558],{"brief":100,"year":104},{"brief":171,"year":72},[240],{"text":561,"source":562},"Bijlage IV Het investeringsprogramma … Maritiem … Vervanging Zr. Ms. Pelikaan (Ondersteuningsschip Caribisch gebied) … 25-100 miljoen",{"title":6,"url":46},{"id":564,"name":565,"area":10,"budget":440,"mandate":167,"briefs":566,"instroom":569,"official":570,"project":120,"comparison":120},"vervanging-low-frequency-acoustic-sonar-lfas","Vervanging Low Frequency Acoustic Sonar (LFAS)",[567,568],{"brief":100,"year":104},{"brief":171,"year":72},[240],{"text":571,"source":572},"Bijlage IV Het investeringsprogramma … Maritiem … Vervanging Low Frequency Acoustic Sonar (LFAS) … 25-100 miljoen",{"title":6,"url":46},{"id":574,"name":575,"area":11,"budget":125,"briefs":576,"instroom":580,"official":581,"project":120,"comparison":120},"vervanging-fennek","Vervanging Fennek",[577,578,579],{"brief":100,"year":106},{"brief":67,"year":422},{"brief":69,"year":253},[52],{"text":582,"source":583},"Bijlage IV Het investeringsprogramma … Land … Vervanging Fennek … 1000-2500 miljoen",{"title":6,"url":46},{"id":585,"name":586,"area":11,"budget":149,"mandate":167,"briefs":587,"instroom":591,"projectId":592,"official":593,"project":596,"comparison":601},"midlife-update-mlu-cv90","Midlife Update (MLU) CV90",[588,589,590],{"brief":100,"year":5},{"brief":67,"year":85},{"brief":69,"year":70},[16],"midlife-update-mlu-voor-het-wapensysteem-infanterie-gevechtsvoertuig-i",{"text":594,"source":595},"Bijlage IV Het investeringsprogramma … Land … Midlife Update (MLU) CV90 … 250-1000 miljoen",{"title":6,"url":46},{"id":592,"name":597,"steps":598,"newest":600},"Midlife Update (MLU) voor het wapensysteem Infanterie gevechtsvoertuig (IGV) CV9035NL",[599],{"year":129,"edition":282,"phase":87,"label":88},{"year":32,"edition":117,"phase":87,"label":88},{"planned":602,"realisation":603,"yearsLater":185,"verdict":186},{"brief":67,"year":85},{"year":129,"edition":282,"phase":87,"label":88},{"id":605,"name":606,"area":11,"budget":149,"mandate":167,"briefs":607,"instroom":611,"projectId":605,"official":612,"project":615,"comparison":619},"midlife-update-mlu-fennek","Midlife Update (MLU) Fennek",[608,609,610],{"brief":100,"year":5},{"brief":67,"year":129},{"brief":69,"year":85},[70],{"text":613,"source":614},"Bijlage IV Het investeringsprogramma … Land … Midlife Update (MLU) Fennek … 250-1000 miljoen",{"title":6,"url":46},{"id":605,"name":606,"steps":616,"newest":618},[617],{"year":5,"edition":81,"phase":87,"label":88},{"year":32,"edition":117,"phase":87,"label":88},{"planned":620,"realisation":621,"yearsLater":185,"verdict":186},{"brief":67,"year":129},{"year":5,"edition":81,"phase":87,"label":88},{"id":623,"name":624,"area":11,"budget":149,"briefs":625,"instroom":629,"official":630,"project":120,"comparison":120},"vervanging-wissellaadsysteem","Vervanging Wissellaadsysteem",[626,627,628],{"brief":100,"year":129},{"brief":67,"year":85},{"brief":69,"year":70},[16],{"text":631,"source":632},"Bijlage IV Het investeringsprogramma … Land … Vervanging Wissellaadsysteem … 250-1000 miljoen",{"title":6,"url":46},{"id":634,"name":635,"area":11,"budget":149,"briefs":636,"instroom":640,"official":641,"project":120,"comparison":120},"vervanging-medium-en-short-range-anti-tank-mrat-srat","Vervanging Medium en Short Range Anti-Tank (MRAT\u002FSRAT)",[637,638,639],{"brief":100,"year":70},{"brief":67,"year":102},{"brief":69,"year":25},[104,106],{"text":642,"source":643},"Bijlage IV Het investeringsprogramma … Land … Vervanging Medium en Short Range Anti-Tank (MRAT\u002FSRAT) … 250-1000 miljoen",{"title":6,"url":46},{"id":645,"name":646,"area":11,"budget":149,"briefs":647,"instroom":651,"official":652,"project":120,"comparison":120},"vervanging-pantserhouwitzer-pzh","Vervanging Pantserhouwitzer (PzH)",[648,649,650],{"brief":100,"year":72},{"brief":67,"year":106},{"brief":69,"year":240},[422],{"text":653,"source":654},"Bijlage IV Het investeringsprogramma … Land … Vervanging Pantserhouwitzer (PzH) … 250-1000 miljoen",{"title":6,"url":46},{"id":656,"name":657,"area":11,"budget":260,"mandate":167,"briefs":658,"instroom":659,"projectId":660,"official":661,"project":664,"comparison":120},"verwerving-c-ram-class-1-uav-detectiecapaciteit","Verwerving C-RAM\u002FClass 1 UAV Detectiecapaciteit",[],[5],"c-ram-en-class-1-uav-detectiecapaciteit",{"text":662,"source":663},"Bijlage IV Het investeringsprogramma … Land … Verwerving C-RAM\u002FClass 1 UAV Detectiecapaciteit … 100-250 miljoen",{"title":6,"url":46},{"id":660,"name":665,"steps":666,"newest":668},"C-RAM en Class 1-UAV detectiecapaciteit",[667],{"year":5,"edition":81,"phase":87,"label":88},{"year":16,"edition":204,"phase":87,"label":88},{"id":670,"name":671,"area":11,"budget":260,"briefs":672,"instroom":673,"official":674,"project":120,"comparison":120},"vervanging-onderstel-brugleggende-tanks","Vervanging Onderstel Brugleggende Tanks",[],[5],{"text":675,"source":676},"Bijlage IV Het investeringsprogramma … Land … Vervanging Onderstel Brugleggende Tanks … 100-250 miljoen",{"title":6,"url":46},{"id":678,"name":679,"area":11,"budget":260,"briefs":680,"instroom":682,"projectId":683,"official":684,"project":687,"comparison":120},"verwerving-defensie-operationeel-kleding-systeem-doks","Verwerving Defensie Operationeel Kleding Systeem (DOKS)",[681],{"brief":69,"year":5},[129],"defensie-operationeel-kledingsysteem-doks",{"text":685,"source":686},"Bijlage IV Het investeringsprogramma … Land … Verwerving Defensie Operationeel Kleding Systeem (DOKS) … 100-250 miljoen",{"title":6,"url":46},{"id":683,"name":688,"steps":689,"newest":691},"Defensie Operationeel Kledingsysteem (DOKS)",[690],{"year":5,"edition":81,"phase":87,"label":88},{"year":32,"edition":117,"phase":87,"label":88},{"id":693,"name":694,"area":11,"budget":260,"briefs":695,"instroom":699,"official":700,"project":120,"comparison":120},"verwerving-very-short-range-air-defence-vshorad","Verwerving Very Short Range Air Defence (VSHORAD)",[696,697,698],{"brief":100,"year":129},{"brief":67,"year":85},{"brief":69,"year":70},[16],{"text":701,"source":702},"Bijlage IV Het investeringsprogramma … Land … Verwerving Very Short Range Air Defence (VSHORAD) … 100-250 miljoen",{"title":6,"url":46},{"id":704,"name":705,"area":11,"budget":260,"briefs":706,"instroom":710,"official":711,"project":120,"comparison":120},"vervanging-amarok","Vervanging Amarok",[707,708,709],{"brief":100,"year":70},{"brief":67,"year":16},{"brief":69,"year":102},[25],{"text":712,"source":713},"Bijlage IV Het investeringsprogramma … Land … Vervanging Amarok … 100-250 miljoen",{"title":6,"url":46},{"id":715,"name":716,"area":11,"budget":260,"briefs":717,"instroom":721,"official":722,"project":120,"comparison":120},"vervanging-bushmaster","Vervanging Bushmaster",[718,719,720],{"brief":100,"year":104},{"brief":67,"year":72},{"brief":69,"year":251},[106],{"text":723,"source":724},"Bijlage IV Het investeringsprogramma … Land … Vervanging Bushmaster … 100-250 miljoen",{"title":6,"url":46},{"id":726,"name":727,"area":12,"budget":64,"briefs":728,"instroom":729,"projectId":726,"official":730,"project":733,"comparison":120},"verwerving-f-35","Verwerving F-35",[],[129],{"text":731,"source":732},"Bijlage IV Het investeringsprogramma … Lucht … Verwerving F-35 … > 2,5 miljard",{"title":6,"url":46},{"id":726,"name":727,"steps":734,"newest":736},[735],{"year":5,"edition":81,"phase":87,"label":88},{"year":32,"edition":117,"phase":87,"label":88},{"id":738,"name":739,"area":12,"budget":149,"briefs":740,"instroom":741,"projectId":742,"official":743,"project":746,"comparison":120},"vervanging-en-modernisering-v-en-m-chinook","Vervanging en Modernisering (V&M) Chinook",[],[85],"chinook-vervanging-modernisering",{"text":744,"source":745},"Bijlage IV Het investeringsprogramma … Lucht … Vervanging en Modernisering (V&M) Chinook … 250-1000 miljoen",{"title":6,"url":46},{"id":742,"name":747,"steps":748,"newest":750},"Chinook Vervanging & Modernisering",[749],{"year":5,"edition":81,"phase":87,"label":88},{"year":32,"edition":117,"phase":87,"label":88},{"id":752,"name":753,"area":12,"budget":149,"briefs":754,"instroom":755,"projectId":756,"official":757,"project":760,"comparison":120},"verwerving-multi-role-tanker-transport-mrtt","Verwerving Multi Role Tanker Transport (MRTT)",[],[85],"vervanging-strategisch-luchttransport-en-aar-mrtt",{"text":758,"source":759},"Bijlage IV Het investeringsprogramma … Lucht … Verwerving Multi Role Tanker Transport (MRTT) … 250-1000 miljoen",{"title":6,"url":46},{"id":756,"name":761,"steps":762,"newest":764},"Vervanging strategisch luchttransport en AAR (MRTT)",[763],{"year":5,"edition":81,"phase":87,"label":88},{"year":32,"edition":117,"phase":87,"label":88},{"id":766,"name":767,"area":12,"budget":149,"briefs":768,"instroom":771,"projectId":766,"official":772,"project":775,"comparison":779},"apache-remanufacture","Apache Remanufacture",[769],{"brief":770,"year":5},"A\u002FD-brief",[16],{"text":773,"source":774},"Bijlage IV Het investeringsprogramma … Lucht … Apache Remanufacture … 250-1000 miljoen",{"title":6,"url":46},{"id":766,"name":767,"steps":776,"newest":778},[777],{"year":5,"edition":81,"phase":87,"label":88},{"year":32,"edition":117,"phase":87,"label":88},{"planned":780,"realisation":781,"yearsLater":30,"verdict":186},{"brief":770,"year":5},{"year":5,"edition":81,"phase":87,"label":88},{"id":783,"name":784,"area":12,"budget":149,"briefs":785,"instroom":788,"official":789,"project":120,"comparison":120},"vervanging-c-130","Vervanging C-130",[786,787],{"brief":100,"year":16},{"brief":67,"year":25},[422],{"text":790,"source":791},"Bijlage IV Het investeringsprogramma … Lucht … Vervanging C-130 … 250-1000 miljoen",{"title":6,"url":46},{"id":793,"name":794,"area":12,"budget":260,"briefs":795,"instroom":797,"projectId":798,"official":799,"project":802,"comparison":120},"verwerving-medium-altitude-long-endurance-unmanned-aerial-vehicle-male","Verwerving Medium Altitude Long Endurance Unmanned Aerial Vehicle (MALE UAV)",[796],{"brief":69,"year":5},[70],"medium-altitude-long-endurance-unmanned-aerial-vehicle-male-uav",{"text":800,"source":801},"Bijlage IV Het investeringsprogramma … Lucht … Verwerving Medium Altitude Long Endurance Unmanned Aerial Vehicle (MALE UAV) … 100-250 miljoen",{"title":6,"url":46},{"id":798,"name":803,"steps":804,"newest":806},"Medium Altitude Long Endurance Unmanned Aerial Vehicle (MALE UAV)",[805],{"year":5,"edition":81,"phase":87,"label":88},{"year":16,"edition":204,"phase":87,"label":88},{"id":808,"name":809,"area":12,"budget":260,"briefs":810,"instroom":814,"official":815,"project":120,"comparison":120},"block-upgrade-nh90","Block Upgrade NH90",[811,812,813],{"brief":100,"year":85},{"brief":67,"year":25},{"brief":69,"year":104},[32],{"text":816,"source":817},"Bijlage IV Het investeringsprogramma … Lucht … Block Upgrade NH90 … 100-250 miljoen",{"title":6,"url":46},{"id":819,"name":820,"area":12,"budget":260,"briefs":821,"instroom":825,"official":826,"project":120,"comparison":120},"vervanging-pc-7","Vervanging PC-7",[822,823,824],{"brief":100,"year":85},{"brief":67,"year":16},{"brief":69,"year":102},[104],{"text":827,"source":828},"Bijlage IV Het investeringsprogramma … Lucht … Vervanging PC-7 … 100-250 miljoen",{"title":6,"url":46},{"id":830,"name":831,"area":12,"budget":440,"mandate":167,"briefs":832,"instroom":835,"official":836,"project":120,"comparison":120},"verwerving-tactische-lucht-grond-bewapening-f-35","Verwerving Tactische Lucht-Grond Bewapening F-35",[833,834],{"brief":67,"year":5},{"brief":69,"year":129},[102],{"text":837,"source":838},"Bijlage IV Het investeringsprogramma … Lucht … Verwerving Tactische Lucht-Grond Bewapening F-35 … 25-100 miljoen",{"title":6,"url":46},{"id":840,"name":841,"area":12,"budget":440,"mandate":167,"briefs":842,"instroom":846,"projectId":847,"official":848,"project":851,"comparison":856},"multi-ship-multi-type-msmt-helicoptersimulator","Multi-Ship, Multi-Type (MSMT) Helicoptersimulator",[843,844,845],{"brief":100,"year":5},{"brief":67,"year":129},{"brief":69,"year":85},[16],"multi-ship-multi-type-msmt-helikopter-simulatoren",{"text":849,"source":850},"Bijlage IV Het investeringsprogramma … Lucht … Multi-Ship, Multi-Type (MSMT) Helicoptersimulator … 25-100 miljoen",{"title":6,"url":46},{"id":847,"name":852,"steps":853,"newest":855},"Multi Ship Multi Type (MSMT) Helikopter Simulatoren",[854],{"year":129,"edition":282,"phase":87,"label":88},{"year":32,"edition":117,"phase":87,"label":88},{"planned":857,"realisation":858,"yearsLater":30,"verdict":186},{"brief":67,"year":129},{"year":129,"edition":282,"phase":87,"label":88},{"id":860,"name":861,"area":12,"budget":440,"mandate":167,"briefs":862,"instroom":866,"official":867,"project":120,"comparison":120},"instandhoudingsprogramma-c-130","Instandhoudingsprogramma C-130",[863,864,865],{"brief":100,"year":129},{"brief":67,"year":85},{"brief":69,"year":70},[16],{"text":868,"source":869},"Bijlage IV Het investeringsprogramma … Lucht … Instandhoudingsprogramma C-130 … 25-100 miljoen",{"title":6,"url":46},{"id":871,"name":872,"area":12,"budget":440,"mandate":167,"briefs":873,"instroom":877,"official":878,"project":120,"comparison":120},"verwerving-strategische-lucht-grond-bewapening-f-35","Verwerving Strategische Lucht-Grond Bewapening F-35",[874,875,876],{"brief":100,"year":129},{"brief":67,"year":85},{"brief":69,"year":70},[25],{"text":879,"source":880},"Bijlage IV Het investeringsprogramma … Lucht … Verwerving Strategische Lucht-Grond Bewapening F-35 … 25-100 miljoen",{"title":6,"url":46},{"id":882,"name":883,"area":12,"budget":440,"mandate":167,"briefs":884,"instroom":888,"official":889,"project":120,"comparison":120},"verwerving-piloting-forward-looking-infra-red-pflir-nh-90","Verwerving Piloting Forward Looking Infra-Red (PFLIR) NH-90",[885,886,887],{"brief":100,"year":85},{"brief":67,"year":70},{"brief":69,"year":16},[25],{"text":890,"source":891},"Bijlage IV Het investeringsprogramma … Lucht … Verwerving Piloting Forward Looking Infra-Red (PFLIR) NH-90 … 25-100 miljoen",{"title":6,"url":46},{"id":893,"name":894,"area":12,"budget":440,"mandate":167,"briefs":895,"instroom":898,"projectId":899,"official":900,"project":903,"comparison":908},"vervanging-gulfstream","Vervanging Gulfstream",[896,897],{"brief":100,"year":85},{"brief":171,"year":70},[16],"vervanging-gulfstream-iv",{"text":901,"source":902},"Bijlage IV Het investeringsprogramma … Lucht … Vervanging Gulfstream … 25-100 miljoen",{"title":6,"url":46},{"id":899,"name":904,"steps":905,"newest":907},"Vervanging Gulfstream IV",[906],{"year":85,"edition":86,"phase":87,"label":88},{"year":102,"edition":163,"phase":87,"label":88},{"planned":909,"realisation":910,"yearsLater":185,"verdict":186},{"brief":171,"year":70},{"year":85,"edition":86,"phase":87,"label":88},{"id":912,"name":913,"area":13,"budget":149,"briefs":914,"instroom":917,"official":918,"project":120,"comparison":120},"aanvullen-munitievoorraden","Aanvullen Munitievoorraden",[915,916],{"brief":100,"year":5},{"brief":67,"year":129},[85],{"text":919,"source":920},"Bijlage IV Het investeringsprogramma … Defensiebreed … Aanvullen Munitievoorraden … 250-1000 miljoen",{"title":6,"url":46},{"id":922,"name":923,"area":13,"budget":260,"mandate":167,"briefs":924,"instroom":927,"projectId":922,"official":928,"project":931,"comparison":937},"vervanging-gevechtsuitrusting","Vervanging Gevechtsuitrusting",[925,926],{"brief":100,"year":5},{"brief":171,"year":129},[85],{"text":929,"source":930},"Bijlage IV Het investeringsprogramma … Defensiebreed … Vervanging Gevechtsuitrusting … 100-250 miljoen",{"title":6,"url":46},{"id":922,"name":932,"steps":933,"newest":936},"Vervanging gevechtsuitrusting",[934,935],{"year":5,"edition":81,"phase":82,"label":83},{"year":85,"edition":86,"phase":87,"label":88},{"year":16,"edition":204,"phase":87,"label":88},{"planned":938,"realisation":939,"yearsLater":145,"verdict":94},{"brief":171,"year":129},{"year":85,"edition":86,"phase":87,"label":88},{"id":941,"name":942,"area":13,"budget":260,"briefs":943,"instroom":947,"official":948,"project":120,"comparison":120},"vervanging-klein-kaliber-wapens-kkw","Vervanging Klein Kaliber Wapens (KKW)",[944,945,946],{"brief":100,"year":16},{"brief":67,"year":25},{"brief":69,"year":104},[32],{"text":949,"source":950},"Bijlage IV Het investeringsprogramma … Defensiebreed … Vervanging Klein Kaliber Wapens (KKW) … 100-250 miljoen",{"title":6,"url":46},{"id":952,"name":953,"area":13,"budget":260,"briefs":954,"instroom":955,"projectId":956,"official":957,"project":960,"comparison":120},"verwerving-defensie-bewaking-en-beveiligingsssysteem-dbbs","Verwerving Defensie Bewaking- en Beveiligingsssysteem (DBBS)",[],[16],"defensie-bewakings-en-beveiligingssysteem-dbbs",{"text":958,"source":959},"Bijlage IV Het investeringsprogramma … Defensiebreed … Verwerving Defensie Bewaking- en Beveiligingsssysteem (DBBS) … 100-250 miljoen",{"title":6,"url":46},{"id":956,"name":961,"steps":962,"newest":964},"Defensie Bewakings- en Beveiligingssysteem (DBBS)",[963],{"year":5,"edition":81,"phase":87,"label":88},{"year":32,"edition":117,"phase":87,"label":88},{"id":966,"name":967,"area":13,"budget":260,"briefs":968,"instroom":972,"official":973,"project":120,"comparison":120},"vervanging-verbeterd-operationeel-soldaat-systeem-voss","Vervanging Verbeterd Operationeel Soldaat Systeem (VOSS)",[969,970,971],{"brief":100,"year":251},{"brief":67,"year":106},{"brief":69,"year":240},[422],{"text":974,"source":975},"Bijlage IV Het investeringsprogramma … Defensiebreed … Vervanging Verbeterd Operationeel Soldaat Systeem (VOSS) … 100-250 miljoen",{"title":6,"url":46},{"id":977,"name":978,"area":13,"budget":440,"mandate":167,"briefs":979,"instroom":982,"official":983,"project":120,"comparison":120},"operationele-infra-en-geneeskundige-verbruiksgoederen","Operationele Infra en Geneeskundige Verbruiksgoederen",[980,981],{"brief":100,"year":5},{"brief":171,"year":129},[85],{"text":984,"source":985},"Bijlage IV Het investeringsprogramma … Defensiebreed … Operationele Infra en Geneeskundige Verbruiksgoederen … 25-100 miljoen",{"title":6,"url":46},{"id":987,"name":988,"area":13,"budget":440,"mandate":167,"briefs":989,"instroom":992,"official":993,"project":120,"comparison":120},"defensiebrede-vervanging-handgedragen-warmtebeeldkijker","Defensiebrede Vervanging Handgedragen Warmtebeeldkijker",[990,991],{"brief":100,"year":104},{"brief":69,"year":32},[72],{"text":994,"source":995},"Bijlage IV Het investeringsprogramma … Defensiebreed … Defensiebrede Vervanging Handgedragen Warmtebeeldkijker … 25-100 miljoen",{"title":6,"url":46},"2026-10-26"]