[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"$fwa5jg1uq5ehb":3,"meta":37,"plans-2018":43},[4,15,24,31],{"year":5,"title":6,"plans":7,"linked":8,"areas":9,"compared":14},2018,"Defensienota 2018 – investeren in onze mensen, slagkracht en zichtbaarheid",65,29,[10,11,12,13],"maritiem","land","lucht","defensiebreed",19,{"year":16,"title":17,"plans":18,"linked":19,"areas":20,"compared":23},2022,"Defensienota 2022 – Sterker Nederland, veiliger Europa",201,113,[13,10,11,12,21,22],"infrastructuur","it",5,{"year":25,"title":26,"plans":27,"linked":28,"areas":29,"compared":30},2024,"Defensienota 2024: Sterk, slim en samen",21,9,[11,10,12,13],0,{"year":32,"title":33,"plans":34,"linked":30,"areas":35,"compared":30},2026,"Defensienota 2026 – Samen voorwaarts!",12,[13,10,12,11,36,22],"marechaussee",{"version":38,"updated":39,"site":40},"1f0fb61ca9fa0ca2","2026-11-04",{"commit":41,"date":42},"d47d41cb","2026-11-05",{"id":44,"year":5,"title":6,"published":45,"source":46,"sha256":48,"table":49,"about":54,"plans":61,"updated":997,"overviewYear":32,"hasOverviewAfter":168},"defensienota-2018","2018-03-28",{"title":6,"url":47},"https:\u002F\u002Fzoek.officielebekendmakingen.nl\u002Fblg-836989.pdf","6e7e5b10980cd6ad1ce719803aed1326f4946b0e9d518f92f1f8f668c3904f1f",{"title":50,"pages":51,"years":52},"Bijlage IV Het investeringsprogramma","27–28",[5,53],2033,[55,58],{"text":56,"source":57},"In bijlage IV is het investeringsprogramma te vinden met alle vervangings- en vernieuwingsinvesteringen (boven de 25 miljoen euro) voor de komende vijftien jaar.",{"title":6,"url":47},{"text":59,"source":60},"Conform het Defensie Materieel Proces (DMP) zal de Tweede Kamer per project ter informatie brieven over de behoeftestelling (A-brief), de onderzoeksfase (B-brief) en eventueel vervolgonderzoek (C-brief) ontvangen. Verwervingsbesluiten (D-brief) worden ter behandeling aan de Tweede Kamer voorgelegd.",{"title":6,"url":47},[62,96,123,147,165,188,211,222,233,245,258,267,288,301,312,333,355,374,385,404,415,427,438,458,475,494,504,515,534,544,554,564,574,585,605,623,634,645,656,670,678,693,704,715,726,738,752,766,783,793,808,819,830,840,860,871,882,893,912,922,941,952,966,977,987],{"id":63,"name":64,"area":10,"budget":65,"briefs":66,"instroom":72,"projectId":74,"official":75,"project":78,"comparison":91},"vervanging-onderzeebootcapaciteit-ozbt","Vervanging Onderzeebootcapaciteit (OZBT)","> 2,5 miljard",[67,69],{"brief":68,"year":5},"B-brief",{"brief":70,"year":71},"D-brief",2021,[73],2027,"vervanging-onderzeebootcapaciteit",{"text":76,"source":77},"Bijlage IV Het investeringsprogramma … Maritiem … Vervanging Onderzeebootcapaciteit (OZBT) … > 2,5 miljard",{"title":6,"url":47},{"id":74,"name":79,"steps":80,"newest":90},"Vervanging onderzeebootcapaciteit",[81,85],{"year":5,"edition":82,"phase":83,"label":84},"MPO 2018","onderzoek","In onderzoek",{"year":86,"edition":87,"phase":88,"label":89},2020,"DPO 2020","realisatie","In realisatie",{"year":86,"edition":87,"phase":88,"label":89},{"planned":92,"realisation":93,"yearsLater":94,"verdict":95},{"brief":68,"year":5},{"year":86,"edition":87,"phase":88,"label":89},2,"later",{"id":97,"name":98,"area":10,"budget":65,"briefs":99,"instroom":106,"projectId":108,"official":109,"project":112,"comparison":119},"vervanging-luchtverdedigings-en-commando-fregatten-lcf-incl-studies","Vervanging Luchtverdedigings- en Commando Fregatten (LCF) (incl. studies)",[100,102,104],{"brief":101,"year":71},"A-brief",{"brief":68,"year":103},2023,{"brief":70,"year":105},2025,[107],2029,"vervanging-lc-fregatten",{"text":110,"source":111},"Bijlage IV Het investeringsprogramma … Maritiem … Vervanging Luchtverdedigings- en Commando Fregatten (LCF) (incl. studies) … > 2,5 miljard",{"title":6,"url":47},{"id":108,"name":113,"steps":114,"newest":117},"Vervanging LC-fregatten",[115],{"year":25,"edition":116,"phase":83,"label":84},"DPO 2024",{"year":32,"edition":118,"phase":83,"label":84},"DPO 2026",{"planned":120,"realisation":121,"yearsLater":121,"verdict":122},{"brief":68,"year":103},null,"nog-niet",{"id":124,"name":125,"area":10,"budget":126,"briefs":127,"instroom":132,"projectId":133,"official":134,"project":137,"comparison":143},"vervanging-multipurpose-fregat-mff","Vervanging Multipurpose Fregat (MFF)","1000-2500 miljoen",[128,129,131],{"brief":101,"year":5},{"brief":68,"year":130},2019,{"brief":70,"year":86},[25],"vervanging-m-fregatten-aswf",{"text":135,"source":136},"Bijlage IV Het investeringsprogramma … Maritiem … Vervanging Multipurpose Fregat (MFF) … 1000-2500 miljoen",{"title":6,"url":47},{"id":133,"name":138,"steps":139,"newest":142},"Vervanging M-fregatten (ASWF)",[140,141],{"year":5,"edition":82,"phase":83,"label":84},{"year":86,"edition":87,"phase":88,"label":89},{"year":32,"edition":118,"phase":88,"label":89},{"planned":144,"realisation":145,"yearsLater":146,"verdict":95},{"brief":68,"year":130},{"year":86,"edition":87,"phase":88,"label":89},1,{"id":148,"name":149,"area":10,"budget":150,"briefs":151,"instroom":154,"projectId":155,"official":156,"project":159,"comparison":121},"vervanging-maritime-counter-mines-mcm-capaciteit","Vervanging Maritime Counter Mines (MCM) Capaciteit","250-1000 miljoen",[152,153],{"brief":101,"year":5},{"brief":70,"year":130},[25],"vervanging-mijnenbestrijdingscapaciteit",{"text":157,"source":158},"Bijlage IV Het investeringsprogramma … Maritiem … Vervanging Maritime Counter Mines (MCM) Capaciteit … 250-1000 miljoen",{"title":6,"url":47},{"id":155,"name":160,"steps":161,"newest":163},"Vervanging mijnenbestrijdingscapaciteit",[162],{"year":5,"edition":82,"phase":88,"label":89},{"year":103,"edition":164,"phase":88,"label":89},"DPO 2023",{"id":166,"name":167,"area":10,"budget":150,"mandate":168,"briefs":169,"instroom":173,"projectId":174,"official":175,"project":178,"comparison":183},"verwerving-combat-support-ship-css","Verwerving Combat Support Ship (CSS)",true,[170,171],{"brief":101,"year":5},{"brief":172,"year":130},"B\u002FD-brief",[16],"verwerving-combat-support-ship",{"text":176,"source":177},"Bijlage IV Het investeringsprogramma … Maritiem … Verwerving Combat Support Ship (CSS) … 250-1000 miljoen",{"title":6,"url":47},{"id":174,"name":179,"steps":180,"newest":182},"Verwerving Combat Support Ship",[181],{"year":5,"edition":82,"phase":88,"label":89},{"year":32,"edition":118,"phase":88,"label":89},{"planned":184,"realisation":185,"yearsLater":186,"verdict":187},{"brief":172,"year":130},{"year":5,"edition":82,"phase":88,"label":89},-1,"op-tijd",{"id":189,"name":190,"area":10,"budget":150,"briefs":191,"instroom":195,"projectId":196,"official":197,"project":200,"comparison":207},"verwerving-en-integratie-evolved-sea-sparrow-missile-essm-block-2","Verwerving & Integratie Evolved Sea Sparrow Missile (ESSM) Block 2",[192,193,194],{"brief":101,"year":5},{"brief":68,"year":130},{"brief":70,"year":86},[16],"essm-block-2-verwerving-en-integratie",{"text":198,"source":199},"Bijlage IV Het investeringsprogramma … Maritiem … Verwerving & Integratie Evolved Sea Sparrow Missile (ESSM) Block 2 … 250-1000 miljoen",{"title":6,"url":47},{"id":196,"name":201,"steps":202,"newest":206},"ESSM Block 2: Verwerving en integratie",[203,204],{"year":5,"edition":82,"phase":83,"label":84},{"year":16,"edition":205,"phase":88,"label":89},"DPO 2022",{"year":32,"edition":118,"phase":88,"label":89},{"planned":208,"realisation":209,"yearsLater":210,"verdict":95},{"brief":68,"year":130},{"year":16,"edition":205,"phase":88,"label":89},3,{"id":212,"name":213,"area":10,"budget":150,"briefs":214,"instroom":218,"official":219,"project":121,"comparison":121},"vervanging-all-terrain-vehicle-atv","Vervanging All Terrain Vehicle (ATV)",[215,216,217],{"brief":101,"year":130},{"brief":68,"year":71},{"brief":70,"year":16},[25],{"text":220,"source":221},"Bijlage IV Het investeringsprogramma … Maritiem … Vervanging All Terrain Vehicle (ATV) … 250-1000 miljoen",{"title":6,"url":47},{"id":223,"name":224,"area":10,"budget":150,"briefs":225,"instroom":229,"official":230,"project":121,"comparison":121},"vervanging-standard-missile-2-block-iiia-sm2-iiia","Vervanging Standard Missile 2 Block IIIA (SM2-IIIA)",[226,227,228],{"brief":101,"year":103},{"brief":68,"year":105},{"brief":70,"year":32},[107],{"text":231,"source":232},"Bijlage IV Het investeringsprogramma … Maritiem … Vervanging Standard Missile 2 Block IIIA (SM2-IIIA) … 250-1000 miljoen",{"title":6,"url":47},{"id":234,"name":235,"area":10,"budget":150,"briefs":236,"instroom":240,"official":242,"project":121,"comparison":121},"vervanging-zr-ms-rotterdam-lpd-1","Vervanging Zr. Ms. Rotterdam (LPD-1)",[237,238,239],{"brief":101,"year":103},{"brief":68,"year":105},{"brief":70,"year":32},[241],2030,{"text":243,"source":244},"Bijlage IV Het investeringsprogramma … Maritiem … Vervanging Zr. Ms. Rotterdam (LPD-1) … 250-1000 miljoen",{"title":6,"url":47},{"id":246,"name":247,"area":10,"budget":150,"briefs":248,"instroom":253,"official":255,"project":121,"comparison":121},"vervanging-zr-ms-johan-de-witt-lpd-2","Vervanging Zr. Ms. Johan de Witt (LPD-2)",[249,250,251],{"brief":101,"year":105},{"brief":68,"year":73},{"brief":70,"year":252},2028,[254],2032,{"text":256,"source":257},"Bijlage IV Het investeringsprogramma … Maritiem … Vervanging Zr. Ms. Johan de Witt (LPD-2) … 250-1000 miljoen",{"title":6,"url":47},{"id":259,"name":260,"area":10,"budget":261,"briefs":262,"instroom":263,"official":264,"project":121,"comparison":121},"midlife-update-mlu-luchtverdedigings-en-commando-fregatten-lcf","Midlife Update (MLU) Luchtverdedigings- en Commando Fregatten (LCF)","100-250 miljoen",[],[5],{"text":265,"source":266},"Bijlage IV Het investeringsprogramma … Maritiem … Midlife Update (MLU) Luchtverdedigings- en Commando Fregatten (LCF) … 100-250 miljoen",{"title":6,"url":47},{"id":268,"name":269,"area":10,"budget":261,"mandate":168,"briefs":270,"instroom":273,"projectId":274,"official":275,"project":278,"comparison":285},"vervanging-kanons-luchtverdedigings-en-commando-fregatten-lcf","Vervanging Kanons Luchtverdedigings- en Commando Fregatten (LCF)",[271,272],{"brief":101,"year":5},{"brief":172,"year":130},[86],"vervanging-127-mm-kanon-luchtverdedigings-en-commandofregatten",{"text":276,"source":277},"Bijlage IV Het investeringsprogramma … Maritiem … Vervanging Kanons Luchtverdedigings- en Commando Fregatten (LCF) … 100-250 miljoen",{"title":6,"url":47},{"id":274,"name":279,"steps":280,"newest":284},"Vervanging 127 mm kanon Luchtverdedigings- en Commandofregatten",[281,282],{"year":5,"edition":82,"phase":83,"label":84},{"year":130,"edition":283,"phase":88,"label":89},"DPO 2019",{"year":32,"edition":118,"phase":88,"label":89},{"planned":286,"realisation":287,"yearsLater":30,"verdict":187},{"brief":172,"year":130},{"year":130,"edition":283,"phase":88,"label":89},{"id":289,"name":290,"area":10,"budget":261,"briefs":291,"instroom":292,"projectId":289,"official":293,"project":296,"comparison":121},"vervanging-mk46-lightweight-torpedo","Vervanging MK46 Lightweight Torpedo",[],[86],{"text":294,"source":295},"Bijlage IV Het investeringsprogramma … Maritiem … Vervanging MK46 Lightweight Torpedo … 100-250 miljoen",{"title":6,"url":47},{"id":289,"name":297,"steps":298,"newest":300},"Vervanging MK46 Lightweight torpedo",[299],{"year":5,"edition":82,"phase":88,"label":89},{"year":32,"edition":118,"phase":88,"label":89},{"id":302,"name":303,"area":10,"budget":261,"mandate":168,"briefs":304,"instroom":308,"official":309,"project":121,"comparison":121},"verwerving-torpedo-defensiesysteem-vlootbreed","Verwerving Torpedo Defensiesysteem (vlootbreed)",[305,306,307],{"brief":101,"year":5},{"brief":68,"year":130},{"brief":70,"year":86},[71],{"text":310,"source":311},"Bijlage IV Het investeringsprogramma … Maritiem … Verwerving Torpedo Defensiesysteem (vlootbreed) … 100-250 miljoen",{"title":6,"url":47},{"id":313,"name":314,"area":10,"budget":261,"mandate":168,"briefs":315,"instroom":319,"projectId":320,"official":321,"project":324,"comparison":330},"vervanging-harpoon-missile-surface-to-surface-missile","Vervanging Harpoon Missile (surface-to-surface missile)",[316,317,318],{"brief":101,"year":5},{"brief":68,"year":130},{"brief":70,"year":86},[103],"vervanging-maritiem-surface-to-surface-missile",{"text":322,"source":323},"Bijlage IV Het investeringsprogramma … Maritiem … Vervanging Harpoon Missile (surface-to-surface missile) … 100-250 miljoen",{"title":6,"url":47},{"id":320,"name":325,"steps":326,"newest":329},"Vervanging Maritiem Surface-to-surface missile",[327,328],{"year":5,"edition":82,"phase":83,"label":84},{"year":86,"edition":87,"phase":88,"label":89},{"year":32,"edition":118,"phase":88,"label":89},{"planned":331,"realisation":332,"yearsLater":146,"verdict":95},{"brief":68,"year":130},{"year":86,"edition":87,"phase":88,"label":89},{"id":334,"name":335,"area":10,"budget":261,"briefs":336,"instroom":340,"projectId":341,"official":342,"project":345,"comparison":352},"vervanging-goalkeeper-close-in-weapon-system","Vervanging Goalkeeper (Close-in Weapon System)",[337,338,339],{"brief":101,"year":5},{"brief":68,"year":130},{"brief":70,"year":86},[103],"vervanging-close-in-weapon-system-vciws",{"text":343,"source":344},"Bijlage IV Het investeringsprogramma … Maritiem … Vervanging Goalkeeper (Close-in Weapon System) … 100-250 miljoen",{"title":6,"url":47},{"id":341,"name":346,"steps":347,"newest":351},"Vervanging Close-in Weapon System (vCIWS)",[348,349],{"year":5,"edition":82,"phase":83,"label":84},{"year":71,"edition":350,"phase":88,"label":89},"DPO 2021",{"year":32,"edition":118,"phase":88,"label":89},{"planned":353,"realisation":354,"yearsLater":94,"verdict":95},{"brief":68,"year":130},{"year":71,"edition":350,"phase":88,"label":89},{"id":356,"name":357,"area":10,"budget":261,"briefs":358,"instroom":362,"projectId":356,"official":363,"project":366,"comparison":371},"vervanging-middelzwaar-landingsvaartuig-lcvp","Vervanging Middelzwaar Landingsvaartuig (LCVP)",[359,360,361],{"brief":101,"year":86},{"brief":68,"year":71},{"brief":70,"year":16},[25],{"text":364,"source":365},"Bijlage IV Het investeringsprogramma … Maritiem … Vervanging Middelzwaar Landingsvaartuig (LCVP) … 100-250 miljoen",{"title":6,"url":47},{"id":356,"name":367,"steps":368,"newest":370},"Vervanging middelzwaar landingsvaartuig (LCVP)",[369],{"year":103,"edition":164,"phase":88,"label":89},{"year":32,"edition":118,"phase":88,"label":89},{"planned":372,"realisation":373,"yearsLater":94,"verdict":95},{"brief":68,"year":71},{"year":103,"edition":164,"phase":88,"label":89},{"id":375,"name":376,"area":10,"budget":261,"briefs":377,"instroom":381,"official":382,"project":121,"comparison":121},"vervanging-zr-ms-mercuur-en-hydrografische-opname-vaartuigen-hovs","Vervanging Zr. Ms. Mercuur & Hydrografische Opname Vaartuigen (HOVs)",[378,379,380],{"brief":101,"year":86},{"brief":68,"year":71},{"brief":70,"year":16},[32,53],{"text":383,"source":384},"Bijlage IV Het investeringsprogramma … Maritiem … Vervanging Zr. Ms. Mercuur & Hydrografische Opname Vaartuigen (HOVs) … 100-250 miljoen",{"title":6,"url":47},{"id":386,"name":387,"area":10,"budget":261,"briefs":388,"instroom":392,"projectId":386,"official":393,"project":396,"comparison":401},"midlife-update-mlu-oceangoing-patrol-vessel-opv","Midlife Update (MLU) Oceangoing Patrol Vessel (OPV)",[389,390,391],{"brief":101,"year":71},{"brief":68,"year":16},{"brief":70,"year":103},[105],{"text":394,"source":395},"Bijlage IV Het investeringsprogramma … Maritiem … Midlife Update (MLU) Oceangoing Patrol Vessel (OPV) … 100-250 miljoen",{"title":6,"url":47},{"id":386,"name":387,"steps":397,"newest":400},[398,399],{"year":16,"edition":205,"phase":83,"label":84},{"year":103,"edition":164,"phase":88,"label":89},{"year":32,"edition":118,"phase":88,"label":89},{"planned":402,"realisation":403,"yearsLater":146,"verdict":95},{"brief":68,"year":16},{"year":103,"edition":164,"phase":88,"label":89},{"id":405,"name":406,"area":10,"budget":261,"briefs":407,"instroom":411,"official":412,"project":121,"comparison":121},"midlife-update-mlu-zr-ms-karel-doorman-joint-support-ship-jss","Midlife Update (MLU) Zr. Ms. Karel Doorman (Joint Support Ship, JSS)",[408,409,410],{"brief":101,"year":16},{"brief":68,"year":25},{"brief":70,"year":105},[252],{"text":413,"source":414},"Bijlage IV Het investeringsprogramma … Maritiem … Midlife Update (MLU) Zr. Ms. Karel Doorman (Joint Support Ship, JSS) … 100-250 miljoen",{"title":6,"url":47},{"id":416,"name":417,"area":10,"budget":261,"briefs":418,"instroom":422,"official":424,"project":121,"comparison":121},"vervanging-mk48-heavyweight-torpedo","Vervanging MK48 Heavyweight Torpedo",[419,420,421],{"brief":101,"year":25},{"brief":68,"year":32},{"brief":70,"year":252},[423],2031,{"text":425,"source":426},"Bijlage IV Het investeringsprogramma … Maritiem … Vervanging MK48 Heavyweight Torpedo … 100-250 miljoen",{"title":6,"url":47},{"id":428,"name":429,"area":10,"budget":261,"briefs":430,"instroom":434,"official":435,"project":121,"comparison":121},"vervanging-zwaar-landingsvaartuig-lcu","Vervanging Zwaar Landingsvaartuig (LCU)",[431,432,433],{"brief":101,"year":105},{"brief":68,"year":73},{"brief":70,"year":252},[423],{"text":436,"source":437},"Bijlage IV Het investeringsprogramma … Maritiem … Vervanging Zwaar Landingsvaartuig (LCU) … 100-250 miljoen",{"title":6,"url":47},{"id":439,"name":440,"area":10,"budget":441,"mandate":168,"briefs":442,"instroom":445,"projectId":446,"official":447,"project":450,"comparison":455},"midlife-update-mlu-hydrografische-opname-vaartuigen-hovs","Midlife Update (MLU) Hydrografische Opname Vaartuigen (HOVs)","25-100 miljoen",[443,444],{"brief":101,"year":5},{"brief":172,"year":130},[86],"midlife-update-hydrografische-opnemingsvaartuigen",{"text":448,"source":449},"Bijlage IV Het investeringsprogramma … Maritiem … Midlife Update (MLU) Hydrografische Opname Vaartuigen (HOVs) … 25-100 miljoen",{"title":6,"url":47},{"id":446,"name":451,"steps":452,"newest":454},"Midlife Update Hydrografische Opnemingsvaartuigen",[453],{"year":5,"edition":82,"phase":88,"label":89},{"year":71,"edition":350,"phase":88,"label":89},{"planned":456,"realisation":457,"yearsLater":186,"verdict":187},{"brief":172,"year":130},{"year":5,"edition":82,"phase":88,"label":89},{"id":459,"name":460,"area":10,"budget":441,"mandate":168,"briefs":461,"instroom":464,"projectId":465,"official":466,"project":469,"comparison":121},"midlife-update-mlu-zr-ms-johan-de-witt-lpd-2","Midlife Update (MLU) Zr. Ms. Johan de Witt (LPD-2)",[462,463],{"brief":101,"year":5},{"brief":70,"year":86},[71],"midlife-update-zr-ms-johan-de-witt",{"text":467,"source":468},"Bijlage IV Het investeringsprogramma … Maritiem … Midlife Update (MLU) Zr. Ms. Johan de Witt (LPD-2) … 25-100 miljoen",{"title":6,"url":47},{"id":465,"name":470,"steps":471,"newest":474},"Midlife Update Zr.Ms. Johan de Witt",[472,473],{"year":5,"edition":82,"phase":83,"label":84},{"year":130,"edition":283,"phase":88,"label":89},{"year":16,"edition":205,"phase":88,"label":89},{"id":476,"name":477,"area":10,"budget":441,"mandate":168,"briefs":478,"instroom":481,"projectId":482,"official":483,"project":486,"comparison":491},"aanvulling-standard-missile-2-block-iiia-sm2-iiia","Aanvulling Standard Missile 2 Block IIIA (SM2-IIIA)",[479,480],{"brief":101,"year":130},{"brief":172,"year":86},[71],"aanvulling-standard-missile-2-block-iiia",{"text":484,"source":485},"Bijlage IV Het investeringsprogramma … Maritiem … Aanvulling Standard Missile 2 Block IIIA (SM2-IIIA) … 25-100 miljoen",{"title":6,"url":47},{"id":482,"name":487,"steps":488,"newest":490},"Aanvulling Standard Missile 2 Block IIIA",[489],{"year":86,"edition":87,"phase":88,"label":89},{"year":16,"edition":205,"phase":88,"label":89},{"planned":492,"realisation":493,"yearsLater":30,"verdict":187},{"brief":172,"year":86},{"year":86,"edition":87,"phase":88,"label":89},{"id":495,"name":496,"area":10,"budget":441,"mandate":168,"briefs":497,"instroom":500,"official":501,"project":121,"comparison":121},"deelname-ontwikkeling-standard-missile-2-block-iiic-sm2-iiic","Deelname ontwikkeling Standard Missile 2 Block IIIC (SM2-IIIC)",[498,499],{"brief":101,"year":130},{"brief":172,"year":86},[71],{"text":502,"source":503},"Bijlage IV Het investeringsprogramma … Maritiem … Deelname ontwikkeling Standard Missile 2 Block IIIC (SM2-IIIC) … 25-100 miljoen",{"title":6,"url":47},{"id":505,"name":506,"area":10,"budget":441,"mandate":168,"briefs":507,"instroom":511,"official":512,"project":121,"comparison":121},"vervanging-self-propelled-variable-depth-sonar-spvds","Vervanging Self-Propelled Variable Depth Sonar (SPVDS)",[508,509,510],{"brief":101,"year":130},{"brief":68,"year":86},{"brief":70,"year":71},[16],{"text":513,"source":514},"Bijlage IV Het investeringsprogramma … Maritiem … Vervanging Self-Propelled Variable Depth Sonar (SPVDS) … 25-100 miljoen",{"title":6,"url":47},{"id":516,"name":517,"area":10,"budget":441,"mandate":168,"briefs":518,"instroom":522,"projectId":523,"official":524,"project":527,"comparison":532},"vervanging-fast-raiding-interception-and-special-forces-craft-frisc","Vervanging Fast Raiding, Interception and Special Forces Craft (FRISC)",[519,520,521],{"brief":101,"year":130},{"brief":68,"year":86},{"brief":70,"year":71},[25],"vervanging-en-instandhouding-fast-raiding-interception-and-special-for",{"text":525,"source":526},"Bijlage IV Het investeringsprogramma … Maritiem … Vervanging Fast Raiding, Interception and Special Forces Craft (FRISC) … 25-100 miljoen",{"title":6,"url":47},{"id":523,"name":528,"steps":529,"newest":531},"Vervanging en instandhouding Fast Raiding, Interception and Special Forces Craft (FRISC)",[530],{"year":16,"edition":205,"phase":83,"label":84},{"year":16,"edition":205,"phase":83,"label":84},{"planned":533,"realisation":121,"yearsLater":121,"verdict":122},{"brief":68,"year":86},{"id":535,"name":536,"area":10,"budget":441,"mandate":168,"briefs":537,"instroom":540,"official":541,"project":121,"comparison":121},"vervanging-marine-opleidings-vaartuig-mov-van-kinsbergen","Vervanging Marine Opleidings Vaartuig (MOV Van Kinsbergen)",[538,539],{"brief":101,"year":86},{"brief":172,"year":16},[105],{"text":542,"source":543},"Bijlage IV Het investeringsprogramma … Maritiem … Vervanging Marine Opleidings Vaartuig (MOV Van Kinsbergen) … 25-100 miljoen",{"title":6,"url":47},{"id":545,"name":546,"area":10,"budget":441,"mandate":168,"briefs":547,"instroom":550,"official":551,"project":121,"comparison":121},"vervanging-havenduikvaartuigen","Vervanging Havenduikvaartuigen",[548,549],{"brief":101,"year":16},{"brief":172,"year":25},[73],{"text":552,"source":553},"Bijlage IV Het investeringsprogramma … Maritiem … Vervanging Havenduikvaartuigen … 25-100 miljoen",{"title":6,"url":47},{"id":555,"name":556,"area":10,"budget":441,"mandate":168,"briefs":557,"instroom":560,"official":561,"project":121,"comparison":121},"vervanging-zr-ms-pelikaan-ondersteuningsschip-caribisch-gebied","Vervanging Zr. Ms. Pelikaan (Ondersteuningsschip Caribisch gebied)",[558,559],{"brief":101,"year":105},{"brief":172,"year":73},[241],{"text":562,"source":563},"Bijlage IV Het investeringsprogramma … Maritiem … Vervanging Zr. Ms. Pelikaan (Ondersteuningsschip Caribisch gebied) … 25-100 miljoen",{"title":6,"url":47},{"id":565,"name":566,"area":10,"budget":441,"mandate":168,"briefs":567,"instroom":570,"official":571,"project":121,"comparison":121},"vervanging-low-frequency-acoustic-sonar-lfas","Vervanging Low Frequency Acoustic Sonar (LFAS)",[568,569],{"brief":101,"year":105},{"brief":172,"year":73},[241],{"text":572,"source":573},"Bijlage IV Het investeringsprogramma … Maritiem … Vervanging Low Frequency Acoustic Sonar (LFAS) … 25-100 miljoen",{"title":6,"url":47},{"id":575,"name":576,"area":11,"budget":126,"briefs":577,"instroom":581,"official":582,"project":121,"comparison":121},"vervanging-fennek","Vervanging Fennek",[578,579,580],{"brief":101,"year":107},{"brief":68,"year":423},{"brief":70,"year":254},[53],{"text":583,"source":584},"Bijlage IV Het investeringsprogramma … Land … Vervanging Fennek … 1000-2500 miljoen",{"title":6,"url":47},{"id":586,"name":587,"area":11,"budget":150,"mandate":168,"briefs":588,"instroom":592,"projectId":593,"official":594,"project":597,"comparison":602},"midlife-update-mlu-cv90","Midlife Update (MLU) CV90",[589,590,591],{"brief":101,"year":5},{"brief":68,"year":86},{"brief":70,"year":71},[16],"midlife-update-mlu-voor-het-wapensysteem-infanterie-gevechtsvoertuig-i",{"text":595,"source":596},"Bijlage IV Het investeringsprogramma … Land … Midlife Update (MLU) CV90 … 250-1000 miljoen",{"title":6,"url":47},{"id":593,"name":598,"steps":599,"newest":601},"Midlife Update (MLU) voor het wapensysteem Infanterie gevechtsvoertuig (IGV) CV9035NL",[600],{"year":130,"edition":283,"phase":88,"label":89},{"year":32,"edition":118,"phase":88,"label":89},{"planned":603,"realisation":604,"yearsLater":186,"verdict":187},{"brief":68,"year":86},{"year":130,"edition":283,"phase":88,"label":89},{"id":606,"name":607,"area":11,"budget":150,"mandate":168,"briefs":608,"instroom":612,"projectId":606,"official":613,"project":616,"comparison":620},"midlife-update-mlu-fennek","Midlife Update (MLU) Fennek",[609,610,611],{"brief":101,"year":5},{"brief":68,"year":130},{"brief":70,"year":86},[71],{"text":614,"source":615},"Bijlage IV Het investeringsprogramma … Land … Midlife Update (MLU) Fennek … 250-1000 miljoen",{"title":6,"url":47},{"id":606,"name":607,"steps":617,"newest":619},[618],{"year":5,"edition":82,"phase":88,"label":89},{"year":32,"edition":118,"phase":88,"label":89},{"planned":621,"realisation":622,"yearsLater":186,"verdict":187},{"brief":68,"year":130},{"year":5,"edition":82,"phase":88,"label":89},{"id":624,"name":625,"area":11,"budget":150,"briefs":626,"instroom":630,"official":631,"project":121,"comparison":121},"vervanging-wissellaadsysteem","Vervanging Wissellaadsysteem",[627,628,629],{"brief":101,"year":130},{"brief":68,"year":86},{"brief":70,"year":71},[16],{"text":632,"source":633},"Bijlage IV Het investeringsprogramma … Land … Vervanging Wissellaadsysteem … 250-1000 miljoen",{"title":6,"url":47},{"id":635,"name":636,"area":11,"budget":150,"briefs":637,"instroom":641,"official":642,"project":121,"comparison":121},"vervanging-medium-en-short-range-anti-tank-mrat-srat","Vervanging Medium en Short Range Anti-Tank (MRAT\u002FSRAT)",[638,639,640],{"brief":101,"year":71},{"brief":68,"year":103},{"brief":70,"year":25},[105,107],{"text":643,"source":644},"Bijlage IV Het investeringsprogramma … Land … Vervanging Medium en Short Range Anti-Tank (MRAT\u002FSRAT) … 250-1000 miljoen",{"title":6,"url":47},{"id":646,"name":647,"area":11,"budget":150,"briefs":648,"instroom":652,"official":653,"project":121,"comparison":121},"vervanging-pantserhouwitzer-pzh","Vervanging Pantserhouwitzer (PzH)",[649,650,651],{"brief":101,"year":73},{"brief":68,"year":107},{"brief":70,"year":241},[423],{"text":654,"source":655},"Bijlage IV Het investeringsprogramma … Land … Vervanging Pantserhouwitzer (PzH) … 250-1000 miljoen",{"title":6,"url":47},{"id":657,"name":658,"area":11,"budget":261,"mandate":168,"briefs":659,"instroom":660,"projectId":661,"official":662,"project":665,"comparison":121},"verwerving-c-ram-class-1-uav-detectiecapaciteit","Verwerving C-RAM\u002FClass 1 UAV Detectiecapaciteit",[],[5],"c-ram-en-class-1-uav-detectiecapaciteit",{"text":663,"source":664},"Bijlage IV Het investeringsprogramma … Land … Verwerving C-RAM\u002FClass 1 UAV Detectiecapaciteit … 100-250 miljoen",{"title":6,"url":47},{"id":661,"name":666,"steps":667,"newest":669},"C-RAM en Class 1-UAV detectiecapaciteit",[668],{"year":5,"edition":82,"phase":88,"label":89},{"year":16,"edition":205,"phase":88,"label":89},{"id":671,"name":672,"area":11,"budget":261,"briefs":673,"instroom":674,"official":675,"project":121,"comparison":121},"vervanging-onderstel-brugleggende-tanks","Vervanging Onderstel Brugleggende Tanks",[],[5],{"text":676,"source":677},"Bijlage IV Het investeringsprogramma … Land … Vervanging Onderstel Brugleggende Tanks … 100-250 miljoen",{"title":6,"url":47},{"id":679,"name":680,"area":11,"budget":261,"briefs":681,"instroom":683,"projectId":684,"official":685,"project":688,"comparison":121},"verwerving-defensie-operationeel-kleding-systeem-doks","Verwerving Defensie Operationeel Kleding Systeem (DOKS)",[682],{"brief":70,"year":5},[130],"defensie-operationeel-kledingsysteem-doks",{"text":686,"source":687},"Bijlage IV Het investeringsprogramma … Land … Verwerving Defensie Operationeel Kleding Systeem (DOKS) … 100-250 miljoen",{"title":6,"url":47},{"id":684,"name":689,"steps":690,"newest":692},"Defensie Operationeel Kledingsysteem (DOKS)",[691],{"year":5,"edition":82,"phase":88,"label":89},{"year":32,"edition":118,"phase":88,"label":89},{"id":694,"name":695,"area":11,"budget":261,"briefs":696,"instroom":700,"official":701,"project":121,"comparison":121},"verwerving-very-short-range-air-defence-vshorad","Verwerving Very Short Range Air Defence (VSHORAD)",[697,698,699],{"brief":101,"year":130},{"brief":68,"year":86},{"brief":70,"year":71},[16],{"text":702,"source":703},"Bijlage IV Het investeringsprogramma … Land … Verwerving Very Short Range Air Defence (VSHORAD) … 100-250 miljoen",{"title":6,"url":47},{"id":705,"name":706,"area":11,"budget":261,"briefs":707,"instroom":711,"official":712,"project":121,"comparison":121},"vervanging-amarok","Vervanging Amarok",[708,709,710],{"brief":101,"year":71},{"brief":68,"year":16},{"brief":70,"year":103},[25],{"text":713,"source":714},"Bijlage IV Het investeringsprogramma … Land … Vervanging Amarok … 100-250 miljoen",{"title":6,"url":47},{"id":716,"name":717,"area":11,"budget":261,"briefs":718,"instroom":722,"official":723,"project":121,"comparison":121},"vervanging-bushmaster","Vervanging Bushmaster",[719,720,721],{"brief":101,"year":105},{"brief":68,"year":73},{"brief":70,"year":252},[107],{"text":724,"source":725},"Bijlage IV Het investeringsprogramma … Land … Vervanging Bushmaster … 100-250 miljoen",{"title":6,"url":47},{"id":727,"name":728,"area":12,"budget":65,"briefs":729,"instroom":730,"projectId":727,"official":731,"project":734,"comparison":121},"verwerving-f-35","Verwerving F-35",[],[130],{"text":732,"source":733},"Bijlage IV Het investeringsprogramma … Lucht … Verwerving F-35 … > 2,5 miljard",{"title":6,"url":47},{"id":727,"name":728,"steps":735,"newest":737},[736],{"year":5,"edition":82,"phase":88,"label":89},{"year":32,"edition":118,"phase":88,"label":89},{"id":739,"name":740,"area":12,"budget":150,"briefs":741,"instroom":742,"projectId":743,"official":744,"project":747,"comparison":121},"vervanging-en-modernisering-v-en-m-chinook","Vervanging en Modernisering (V&M) Chinook",[],[86],"chinook-vervanging-modernisering",{"text":745,"source":746},"Bijlage IV Het investeringsprogramma … Lucht … Vervanging en Modernisering (V&M) Chinook … 250-1000 miljoen",{"title":6,"url":47},{"id":743,"name":748,"steps":749,"newest":751},"Chinook Vervanging & Modernisering",[750],{"year":5,"edition":82,"phase":88,"label":89},{"year":32,"edition":118,"phase":88,"label":89},{"id":753,"name":754,"area":12,"budget":150,"briefs":755,"instroom":756,"projectId":757,"official":758,"project":761,"comparison":121},"verwerving-multi-role-tanker-transport-mrtt","Verwerving Multi Role Tanker Transport (MRTT)",[],[86],"vervanging-strategisch-luchttransport-en-aar-mrtt",{"text":759,"source":760},"Bijlage IV Het investeringsprogramma … Lucht … Verwerving Multi Role Tanker Transport (MRTT) … 250-1000 miljoen",{"title":6,"url":47},{"id":757,"name":762,"steps":763,"newest":765},"Vervanging strategisch luchttransport en AAR (MRTT)",[764],{"year":5,"edition":82,"phase":88,"label":89},{"year":32,"edition":118,"phase":88,"label":89},{"id":767,"name":768,"area":12,"budget":150,"briefs":769,"instroom":772,"projectId":767,"official":773,"project":776,"comparison":780},"apache-remanufacture","Apache Remanufacture",[770],{"brief":771,"year":5},"A\u002FD-brief",[16],{"text":774,"source":775},"Bijlage IV Het investeringsprogramma … Lucht … Apache Remanufacture … 250-1000 miljoen",{"title":6,"url":47},{"id":767,"name":768,"steps":777,"newest":779},[778],{"year":5,"edition":82,"phase":88,"label":89},{"year":32,"edition":118,"phase":88,"label":89},{"planned":781,"realisation":782,"yearsLater":30,"verdict":187},{"brief":771,"year":5},{"year":5,"edition":82,"phase":88,"label":89},{"id":784,"name":785,"area":12,"budget":150,"briefs":786,"instroom":789,"official":790,"project":121,"comparison":121},"vervanging-c-130","Vervanging C-130",[787,788],{"brief":101,"year":16},{"brief":68,"year":25},[423],{"text":791,"source":792},"Bijlage IV Het investeringsprogramma … Lucht … Vervanging C-130 … 250-1000 miljoen",{"title":6,"url":47},{"id":794,"name":795,"area":12,"budget":261,"briefs":796,"instroom":798,"projectId":799,"official":800,"project":803,"comparison":121},"verwerving-medium-altitude-long-endurance-unmanned-aerial-vehicle-male","Verwerving Medium Altitude Long Endurance Unmanned Aerial Vehicle (MALE UAV)",[797],{"brief":70,"year":5},[71],"medium-altitude-long-endurance-unmanned-aerial-vehicle-male-uav",{"text":801,"source":802},"Bijlage IV Het investeringsprogramma … Lucht … Verwerving Medium Altitude Long Endurance Unmanned Aerial Vehicle (MALE UAV) … 100-250 miljoen",{"title":6,"url":47},{"id":799,"name":804,"steps":805,"newest":807},"Medium Altitude Long Endurance Unmanned Aerial Vehicle (MALE UAV)",[806],{"year":5,"edition":82,"phase":88,"label":89},{"year":16,"edition":205,"phase":88,"label":89},{"id":809,"name":810,"area":12,"budget":261,"briefs":811,"instroom":815,"official":816,"project":121,"comparison":121},"block-upgrade-nh90","Block Upgrade NH90",[812,813,814],{"brief":101,"year":86},{"brief":68,"year":25},{"brief":70,"year":105},[32],{"text":817,"source":818},"Bijlage IV Het investeringsprogramma … Lucht … Block Upgrade NH90 … 100-250 miljoen",{"title":6,"url":47},{"id":820,"name":821,"area":12,"budget":261,"briefs":822,"instroom":826,"official":827,"project":121,"comparison":121},"vervanging-pc-7","Vervanging PC-7",[823,824,825],{"brief":101,"year":86},{"brief":68,"year":16},{"brief":70,"year":103},[105],{"text":828,"source":829},"Bijlage IV Het investeringsprogramma … Lucht … Vervanging PC-7 … 100-250 miljoen",{"title":6,"url":47},{"id":831,"name":832,"area":12,"budget":441,"mandate":168,"briefs":833,"instroom":836,"official":837,"project":121,"comparison":121},"verwerving-tactische-lucht-grond-bewapening-f-35","Verwerving Tactische Lucht-Grond Bewapening F-35",[834,835],{"brief":68,"year":5},{"brief":70,"year":130},[103],{"text":838,"source":839},"Bijlage IV Het investeringsprogramma … Lucht … Verwerving Tactische Lucht-Grond Bewapening F-35 … 25-100 miljoen",{"title":6,"url":47},{"id":841,"name":842,"area":12,"budget":441,"mandate":168,"briefs":843,"instroom":847,"projectId":848,"official":849,"project":852,"comparison":857},"multi-ship-multi-type-msmt-helicoptersimulator","Multi-Ship, Multi-Type (MSMT) Helicoptersimulator",[844,845,846],{"brief":101,"year":5},{"brief":68,"year":130},{"brief":70,"year":86},[16],"multi-ship-multi-type-msmt-helikopter-simulatoren",{"text":850,"source":851},"Bijlage IV Het investeringsprogramma … Lucht … Multi-Ship, Multi-Type (MSMT) Helicoptersimulator … 25-100 miljoen",{"title":6,"url":47},{"id":848,"name":853,"steps":854,"newest":856},"Multi Ship Multi Type (MSMT) Helikopter Simulatoren",[855],{"year":130,"edition":283,"phase":88,"label":89},{"year":32,"edition":118,"phase":88,"label":89},{"planned":858,"realisation":859,"yearsLater":30,"verdict":187},{"brief":68,"year":130},{"year":130,"edition":283,"phase":88,"label":89},{"id":861,"name":862,"area":12,"budget":441,"mandate":168,"briefs":863,"instroom":867,"official":868,"project":121,"comparison":121},"instandhoudingsprogramma-c-130","Instandhoudingsprogramma C-130",[864,865,866],{"brief":101,"year":130},{"brief":68,"year":86},{"brief":70,"year":71},[16],{"text":869,"source":870},"Bijlage IV Het investeringsprogramma … Lucht … Instandhoudingsprogramma C-130 … 25-100 miljoen",{"title":6,"url":47},{"id":872,"name":873,"area":12,"budget":441,"mandate":168,"briefs":874,"instroom":878,"official":879,"project":121,"comparison":121},"verwerving-strategische-lucht-grond-bewapening-f-35","Verwerving Strategische Lucht-Grond Bewapening F-35",[875,876,877],{"brief":101,"year":130},{"brief":68,"year":86},{"brief":70,"year":71},[25],{"text":880,"source":881},"Bijlage IV Het investeringsprogramma … Lucht … Verwerving Strategische Lucht-Grond Bewapening F-35 … 25-100 miljoen",{"title":6,"url":47},{"id":883,"name":884,"area":12,"budget":441,"mandate":168,"briefs":885,"instroom":889,"official":890,"project":121,"comparison":121},"verwerving-piloting-forward-looking-infra-red-pflir-nh-90","Verwerving Piloting Forward Looking Infra-Red (PFLIR) NH-90",[886,887,888],{"brief":101,"year":86},{"brief":68,"year":71},{"brief":70,"year":16},[25],{"text":891,"source":892},"Bijlage IV Het investeringsprogramma … Lucht … Verwerving Piloting Forward Looking Infra-Red (PFLIR) NH-90 … 25-100 miljoen",{"title":6,"url":47},{"id":894,"name":895,"area":12,"budget":441,"mandate":168,"briefs":896,"instroom":899,"projectId":900,"official":901,"project":904,"comparison":909},"vervanging-gulfstream","Vervanging Gulfstream",[897,898],{"brief":101,"year":86},{"brief":172,"year":71},[16],"vervanging-gulfstream-iv",{"text":902,"source":903},"Bijlage IV Het investeringsprogramma … Lucht … Vervanging Gulfstream … 25-100 miljoen",{"title":6,"url":47},{"id":900,"name":905,"steps":906,"newest":908},"Vervanging Gulfstream IV",[907],{"year":86,"edition":87,"phase":88,"label":89},{"year":103,"edition":164,"phase":88,"label":89},{"planned":910,"realisation":911,"yearsLater":186,"verdict":187},{"brief":172,"year":71},{"year":86,"edition":87,"phase":88,"label":89},{"id":913,"name":914,"area":13,"budget":150,"briefs":915,"instroom":918,"official":919,"project":121,"comparison":121},"aanvullen-munitievoorraden","Aanvullen Munitievoorraden",[916,917],{"brief":101,"year":5},{"brief":68,"year":130},[86],{"text":920,"source":921},"Bijlage IV Het investeringsprogramma … Defensiebreed … Aanvullen Munitievoorraden … 250-1000 miljoen",{"title":6,"url":47},{"id":923,"name":924,"area":13,"budget":261,"mandate":168,"briefs":925,"instroom":928,"projectId":923,"official":929,"project":932,"comparison":938},"vervanging-gevechtsuitrusting","Vervanging Gevechtsuitrusting",[926,927],{"brief":101,"year":5},{"brief":172,"year":130},[86],{"text":930,"source":931},"Bijlage IV Het investeringsprogramma … Defensiebreed … Vervanging Gevechtsuitrusting … 100-250 miljoen",{"title":6,"url":47},{"id":923,"name":933,"steps":934,"newest":937},"Vervanging gevechtsuitrusting",[935,936],{"year":5,"edition":82,"phase":83,"label":84},{"year":86,"edition":87,"phase":88,"label":89},{"year":16,"edition":205,"phase":88,"label":89},{"planned":939,"realisation":940,"yearsLater":146,"verdict":95},{"brief":172,"year":130},{"year":86,"edition":87,"phase":88,"label":89},{"id":942,"name":943,"area":13,"budget":261,"briefs":944,"instroom":948,"official":949,"project":121,"comparison":121},"vervanging-klein-kaliber-wapens-kkw","Vervanging Klein Kaliber Wapens (KKW)",[945,946,947],{"brief":101,"year":16},{"brief":68,"year":25},{"brief":70,"year":105},[32],{"text":950,"source":951},"Bijlage IV Het investeringsprogramma … Defensiebreed … Vervanging Klein Kaliber Wapens (KKW) … 100-250 miljoen",{"title":6,"url":47},{"id":953,"name":954,"area":13,"budget":261,"briefs":955,"instroom":956,"projectId":957,"official":958,"project":961,"comparison":121},"verwerving-defensie-bewaking-en-beveiligingsssysteem-dbbs","Verwerving Defensie Bewaking- en Beveiligingsssysteem (DBBS)",[],[16],"defensie-bewakings-en-beveiligingssysteem-dbbs",{"text":959,"source":960},"Bijlage IV Het investeringsprogramma … Defensiebreed … Verwerving Defensie Bewaking- en Beveiligingsssysteem (DBBS) … 100-250 miljoen",{"title":6,"url":47},{"id":957,"name":962,"steps":963,"newest":965},"Defensie Bewakings- en Beveiligingssysteem (DBBS)",[964],{"year":5,"edition":82,"phase":88,"label":89},{"year":32,"edition":118,"phase":88,"label":89},{"id":967,"name":968,"area":13,"budget":261,"briefs":969,"instroom":973,"official":974,"project":121,"comparison":121},"vervanging-verbeterd-operationeel-soldaat-systeem-voss","Vervanging Verbeterd Operationeel Soldaat Systeem (VOSS)",[970,971,972],{"brief":101,"year":252},{"brief":68,"year":107},{"brief":70,"year":241},[423],{"text":975,"source":976},"Bijlage IV Het investeringsprogramma … Defensiebreed … Vervanging Verbeterd Operationeel Soldaat Systeem (VOSS) … 100-250 miljoen",{"title":6,"url":47},{"id":978,"name":979,"area":13,"budget":441,"mandate":168,"briefs":980,"instroom":983,"official":984,"project":121,"comparison":121},"operationele-infra-en-geneeskundige-verbruiksgoederen","Operationele Infra en Geneeskundige Verbruiksgoederen",[981,982],{"brief":101,"year":5},{"brief":172,"year":130},[86],{"text":985,"source":986},"Bijlage IV Het investeringsprogramma … Defensiebreed … Operationele Infra en Geneeskundige Verbruiksgoederen … 25-100 miljoen",{"title":6,"url":47},{"id":988,"name":989,"area":13,"budget":441,"mandate":168,"briefs":990,"instroom":993,"official":994,"project":121,"comparison":121},"defensiebrede-vervanging-handgedragen-warmtebeeldkijker","Defensiebrede Vervanging Handgedragen Warmtebeeldkijker",[991,992],{"brief":101,"year":105},{"brief":70,"year":32},[73],{"text":995,"source":996},"Bijlage IV Het investeringsprogramma … Defensiebreed … Defensiebrede Vervanging Handgedragen Warmtebeeldkijker … 25-100 miljoen",{"title":6,"url":47},"2026-10-26"]